70 likes | 338 Views
NEI 04-02 Issues Tracking. Issues Tracking. Current List Planned Topics Proposed Communication Plan. Issues Tracking – Current (11/05). Method of treating multiple spurious operations (methods and ROP) Approved/Unapproved manual actions for change analysis
E N D
Issues Tracking • Current List • Planned Topics • Proposed Communication Plan
Issues Tracking – Current (11/05) • Method of treating multiple spurious operations (methods and ROP) • Approved/Unapproved manual actions for change analysis • Non-power operational modes transition – No Shutdown Fire PRA
Issues Tracking – Current (11/05) • How to handle NFPA 805 Ch. 3 post-transition changes • Tracking of post-transition changes • PRA Peer Review • NFPA 805 / NEI 00-01 methodology differences during transition
NEI 04-02 PilotsUpcoming Topics for Discussion • Fire PRA Technical Discussion/ANS Standard development and impacts • Enforcement Discretion • Non-Power Operational Modes Transition • Multiple Spurious Operations Expert Panel • T-H Analysis Acceptance Criteria • Recovery Actions • Human Reliability Analysis for Fire
NEI 04-02 PilotsUpcoming Topics for Discussion • Chapter 3 Manual Firefighting • Fire Protection QA Under NFPA 805 • FP Program Change Process • Resolution of NFPA 805 Chapter 3 Issues • Transition Report • Program Documentation • NFPA 805 License Amendment • Interface with Regional Inspectors