An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LESSONS: RUSSIA URBAN TRANSPORT PROJECT December 16, 2002 Brown-bag lunch seminar given by Slobodan Mitric on the occasion of the first-draft Implementation Completion Report for this project.

  2. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Original loan: $ 329 million • Approved: 1995 • Effective: 1996 • Crisis: 1999 • Restructured: 2000 • Cancellations: $80 million • Disbursed: $249 million

  3. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Acronyms, etc.: • UPT urban public transport • PT public transport • UT urban transport • MoT Ministry of Transport • Oblast regional government

  4. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Beneficiaries: PT companies in 14 cities • Borrower: Russian Federation • Sub-loan to cities, guaranteed by oblasts • Cities took foreign exchange risk • After 1998-99 financial crisis, 6 cities stepped out of the loan, unwilling or unable to service sub-loans

  5. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Original components: • Bus/trolley-bus purchases $278.3 m (actual $247.3m) • Vehicle rehabilitation: $40.90 million (actual $44.75m) • Equipment: $8.9 million (actual $8.25) • Nat’l Spare Parts Program: $50 million (canceled) • TA: $12.9 million (actual $7.97 m)

  6. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Main physical outputs: • 1400 new buses • 38 new trolley-buses • 1400 vehicles rehabilitated • Misc equipment • Studies, workshops

  7. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Objectives (nominal): • 1. Preserve essential UPT capacity in 14 cities by linking financing of urgently needed vehicles and parts to the implementation of reforms • 2. Strengthen UT institutions in client cities so as to improve efficiency of PT operations • 3. Arrest decline of UPT throughout Russia through provision of spare parts • 4. Provide restructuring advice to domestic bus industry

  8. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Restated objectives: • 1a.Preserve essential UPT capacity in 14 cities • 1b. Shift the onus of financing UPT to passengers (cost recovery to reach 40% in 1996) • 2a. Reform relation between public-owned UPT operators & cities • 2b. Improve operations & maintenance of client companies • 2c. Involve the private sector • 3. No change • 4. No change

  9. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Unstated objectives: 5a. Assist MoT in preparing a national strategy for UPT sector 5b. Reform the vehicle procurement process

  10. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Results: • 1a. UPT capacity: achieved (data lacking) • 1b. Cost recovery: achieved; results (49-105%) exceed all expectations • 2a. Status of UPT operators (data lacking) • 2b. Efficiency of operators (data lacking) • 2c. Private sector involvement (data lacking) • 3. Canceled • 4. Bus manufacture: achieved

  11. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Results (cont’d): • 5a. MoT-based UPT reform: achieved; progress exceeding expectations • 5b. Vehicle procurement: achieved

  12. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Overview of results: - best results achieved re 1a and 1b, then 5a and 5b

  13. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Lesson 1: ensure that formal objectives of the project include those linked to activities likely to require much time input during the supervision. Example: work on vehicle specifications and tender documents (objective 5a) took nearly all supervision budget in 1996-98 (but there was no nominal objective related to this)

  14. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Lesson 2: (converse of Lesson 1) ensure that an objective is matched by supervision budget. Example: all reform objectives (especially 2a,b,c) refer to cities, but working close with 14 cities was not feasible

  15. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Lesson 3: ensure that institutional and policy objectives/covenants are matched with legal power to carry it out. Example: cities in this project committed to carry out reforms for which they did not have the legal power

  16. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Lesson 4: avoid weak and/or open-ended conditionality. Example: “cities were to “take all the necessary measures to support the provision of transport services by private individuals or companies …”

  17. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Lesson 5: Check whether any objectives may be conflicting? Example: increasing cost recovery for public sector companies in this project turned out to be in conflict with increasing private PT operations (flight of paying passengers)

  18. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Lesson 6: anticipate the peak in monitoring & evaluation needs at project’s end Example: post-evaluation of bus investments at ICR stage not doable with available (Bank) budget, while the clients made no commitment to do it at their expense

  19. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Lesson 7: do not let local sub-borrowers carry foreign-exchange risk in unstable macro conditions, when their revenues are in local currency Example: due to ruble devaluation, bus contracts denominated in $ and DEM almost tripled in cities’ perception

  20. LESSONS: RUSSIA URBAN TRANSPORT PROJECT • Lesson 8: • Strive to end the project along an ascending curve to get a momentum in the reform process which will carry it well beyond the end of the loan