1 / 10

WISH LISTS

WISH LISTS. GHS. Remodel Office area w/AC. Repair/Replace auditorium seating, ceiling, AC, audio system. Add new press box, restrooms, concession, east side of football field. Redesign main entryway. Replace interior lighting controls w/motion detection sensors.

imani-downs
Download Presentation

WISH LISTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WISH LISTS

  2. GHS Remodel Office area w/AC Repair/Replace auditorium seating, ceiling, AC, audio system Add new press box, restrooms, concession, east side of football field Redesign main entryway Replace interior lighting controls w/motion detection sensors Install building wide phone system w/voicemail Extend curbing around SS Blvd Add locker room N end of Ftball field Replace existing poles/lights on football field Replace aging student desks/chairs Pave gravel area on step Fix/replace roof leaks Add equipment storage and multipurpose/wrestling room Expand existing track Rekey interior of building Enlarge parking lot near LC AC entire building Pave parking area around fields Repair pool area walls/repaint pool Resurface floors in RR – add Exhaust Add covered portico from main gym to locker room Repair ceiling in Thiel Gym Remove cabling/posts along SS Blvd Replace asbestos floor tile Add restrooms to existing weight training room

  3. Churchill Sand & seal stage floor, replace carpet down runways in auditorium Add football locker room, equipment storage, 4 classrooms, auxiliary gym Add fence along Mary Street Renovate all restrooms Add driveway on S side of bldg for bus traffic only Replace floor tiles in hallways & some classrooms Paint metal or replace on west side roof Update building electrical to accommodate new technology Add landscaping in front of building Repair roof over auditorium

  4. Lombard Concrete work needed around building Heat issues in the 1939 building to be addressed New performing arts wing New labs and sinks in science lab 7th grade Upgrade the track Upgrade in library Repair emergency room buttons & clock system Repair AC/Heating system in 8th grade wing Update wiring in older building

  5. Gale Change office layout Replace cafeteria tables Upgrade phone system Phone access in each room Improve appearance of entrance to building Concrete work front sidewalk/entrance Improve air circulation in classrooms Increase size of computer lab Addition of auxiliary gym Additional classrooms needed due to population increase Improve outside lighting for security Additional copiers AC throughout building Add copy room, teachers lounge, meeting room Install outside cameras Add electrical outlets in classrooms Addition of another entrance/exit to Gale – traffic flow problems Replace boiler Paint or replace metal on outside of building Replace floor tiles in copy room and in vault area Replace lighting in gym Clocks Renovate restrooms

  6. King Alternative Gym Natural ceiling lighting Phone upgrades New teacher workstations Copy center upgrades – AC/upgrade electrical Electrical upgrades throughout the building AC throughout building Faculty lounge Communication system upgrades Need for designated drop off in S parking lot Noise reduction in hallway Additional Exterior lighting on the playgrounds Window upgrades Ceiling fans in classrooms Move office to the front of the building Additional rooms needed – classrooms, meeting rooms, data Video security upgrades

  7. Nielson Renovate main restrooms Add additional classrooms and general use space for increasing population by adding a 2nd floor Install AC Improved circulation within the pod areas Add Landscaping in the front of the building Move office area to the front of the building Roof repairs/pitched roof needed Extend parking lot on the N side of the building Additional multipurpose room Additional electrical outlets Upgrade exterior lighting on playground Telephone access to each classroom

  8. Steele Install AC Move office areas to front of the building Phone lines throughout the building Improve circulation in pod areas Update electricity for new technology needs Renovate main restrooms New roof Additional security cameras installed Building an additional gym/fitness center Additional classrooms, offices for instructional services Lighting on playground upgraded

  9. Silas Willard Replace floor tile in several classrooms Add windows that open in stairway to 2nd floor Install additional proximity card entrance door on all outside doors Build walls in office area for nurse/principal Repair/replace cement steps E of gym and back of stage entrance Sand and reseal gym floor Install lockable furnace Upgrade exterior lighting around building/parking lot Renovate all restrooms Install electronic sign Locate & reactivate ceiling vents in 2nd floor Communication upgrades to classrooms/office Add 25 lockers @rooms 104, 105, 110 Replace carpet in building Update electrical systems for modernizing technology Add ramp for handicapped access from E gym to main floor Open up lab and library areas Install AC Install better lighting on stage Remove carpet and install rubber like stairs for stairway and entrance hallway Repair/replace wallpaper upper level of gym Repaint interior walls, ceilings, stage area Window access in basement EBD room #4 Install ceiling fans in classrooms Security upgrades outside of building Install larger canopy at entrance off parking lot New teacher workstations Copy center upgrades

  10. Technology Need for more space for labs, repairs, etc Install high speech fiber optic cabling between buildings Allow students to have internal email addresses More training time for technicians Connect district to internet at much faster speed Automate exchange date between all server with SIF Add additional storage for computer files Additional staff Give each child a laptop and support Frequent meetings with department heads, principals to better serve the needs of staff/students Wireless in every classroom, additional power, video conferencing, telephone Have inter district television station we could broadcast events to every classroom

More Related