250 likes | 421 Views
Stormwater Management Regulation Update. UDC Update Project Agricultural Advisory Board November 13, 2007. Snohomish County Planning & Development Services. UDC. CODE PROVISIONS. Processes & Procedures. Land Use & Zoning. Development Standards. Life, Health & Safety. POLICY FOUNDATION.
E N D
Stormwater Management Regulation Update UDC Update Project Agricultural Advisory Board November 13, 2007 Snohomish CountyPlanning & Development Services
UDC CODE PROVISIONS Processes & Procedures Land Use & Zoning Development Standards Life, Health & Safety POLICY FOUNDATION LEGAL FOUNDATION UDC Life, Health & Safety Pillar
Why Are We Doing This Update? • Protect health and safety • Prevent/minimize degradation of water quality and slope instability • Preserve WQ for aquatic habitats, recreation, and drinking water • Comply with CWA and DOE NPDES Permit
Phase 1 Municipal Stormwater Permit Requirements • Adopt Appendix 1 Minimum Technical Requirements for New Development and Redevelopment • Adopt 2005 DOE Stormwater Manual for Western Washington with a Snohomish County Addendum
How is Stormwater Managed? • Construction Stormwater Pollution Prevention Plan (SWPPP) • Control water flow, install sediment controls, stabilize soils, protect slopes, wetlands, drain inlets, channels and outlets • Control pollutants with Best Management Practices (BMPs), source control, runoff treatment, and treatment facility sizing
What’s New? • More restrictive exemptions • Applies to development and redevelopment • Applies to Class IV FP conversions - stormwater calculations required • More analysis is required for discharges to wetlands and a different baseline is used for the analysis in the 2005 DOE Manual
What’s New? (continued) • Larger detention and retention ponds • Pre LDA site inspection • Reporting and inspections: existing facilities and upgrades • New pollution source control rules • Permit has several less restrictive provisions than existing code
Code Revisions • Revisions to drainage & grading codes - Exemptions - Development & redevelopment thresholds - Minimum requirements
DOE 2005 Manual • Adopt 2005 DOE Manual with addendum and ref to drainage and grading • Change to reflect Snohomish County business practices • Modify for clarity • Change to make “user friendly”
Engineering Design & Development Standards (EDDS) • Revisions to address LID design standards • Review other standards (roads, drainage, etc.) for appropriate revisions • Modify for consistency with code and Drainage Manual • Adopted per rulemaking process
Permit Exemptions 30.63A.020 Exemptions. (draft code in progress) (1) The following commercial agricultural production activities conducted outside ((critical)) wetlands, lakes, marine waters, and fish and wildlife habitatconservation areas and on land designated riverway commercial farmland, upland commercial farmland, or local commercial farmland by the comprehensive plan are exempt from the requirements of this chapter: (a) Tilling, soil preparation, and maintenance; and (b) Fallow rotation, planting, and harvesting except: (i) Conversions from timberland to agriculture and (ii) Construction of impervious surfaces, including but not limited to roads.
Permit Exemptions (2) The following commercial agricultural production activities conducted outside ((critical)) wetlands, lakes, marine waters and fish and wildlife habitat conservation areas and on land designated riverway commercial farmland, upland commercial farmland, or local commercial farmland by the comprehensive plan are exempt from all other requirements of this title except that they shall comply with the stormwater pollution prevention plan (SWPPP) requirements of SCC 30.63A.220(1)(a)-(g), and:
Permit Exemptions (a) Maintenance and repair except the creation of any new impervious surface on private property of existing commercial agricultural facilities, which may include drainage facilities, ponds, animal stock flood sanctuaries, animal waste management facilities, agricultural buildings, fences, roads, and bridges; (b) New construction (((including enlargement))) of drainage ditches that are less than 500 cubic yards or less of land disturbing activity of 2,000 square feet or less, which does not adversely impact ((critical areas, lakes,)) wetlands, lakes, marine waters and fish and wildlife habitat conservation areas or upstream or downstream properties, when such ditches do not have a surface connection within 100 feet of wetlands, lakes, marine waters and fish and wildlife habitat conservation areas or which contain water on-site for retention, infiltration or evaporation pursuant to chapter 30.62 SCC.
Right to Farm (RTF) • DOE and FEMA exemptions: • De minimus ag activities that do not alter contours including tilling, plowing, harvesting, soil amendments and farm ditch digging if the originally constructed ditch configuration is not altered & spoils are removed or tilled as a soil amendment. • Exempt activities also include farm road construction or maintenance which does not alter contours, use culverts and is < 6 inches above grade.
Permit vs. RTF • Federal CWA mandate trumps local initiative • Not allowed: Construction of • Roads • Impervious Surfaces
County’s Strategy • Discuss de-minimus RTF activity with DOE • Provide de-minimus RTF justifications • Send draft code to DOE including existing right to farm provisions
Right to Farm Justification • DOE allows de minimus construction that does not alter contours • Water infiltrates into outwash soils • Roads typically generate < 0.1 cfs threshold • DOE regulates stormwater on farmlands • Drainage plans and development reg by NRCS • Farm plans address stormwater management • Farm roads typically do not impact stormwater systems
Alternatives • Amend code to match permit and include options if DOE will not allow RTF • Porous pavement on roads • Quarry spalls access roads
Related Non-Exemptions • Conversion from timberland to agriculture not exempt
Agricultural Advisory Board Input • Your comments and suggestions on RTF justification and options
General Project Schedule • SEP: Draft codes and DOE Manual • OCT – DEC: Draft documents and public outreach • DEC: Review drafts • FEB: Transmit codes and manual to DOE for 60-day review • APR – JUL 2008: PC and Council Public Hearings • AUG/SEP 2008: Adoption for NPDES permit compliance
Keep in Touch • Status updates and drafts available on the UDC Update Project homepage at www.snoco.org(search UDC Update) • Public can submit comments on the project page
Staff Contacts • Bill Leif, Environmental Program Compliance Specialist, 425-388-3148 • Randy Sleight, Chief Engineering Officer, 425-388-3311, x2014 • Arthur Lee, Project Specialist, 425-388-3812 • Bob McEwen, Transportation Specialist, 425-388-3488, x4578 • Linda Kuller, Chief Planning Officer, 425-388-3412
Acronyms • BMP – Best Management Practices • CESCL – Certified Erosion-Soil Control Lead • CWA – Clean Water Act • DOE – Department of Ecology • DOE Manual – 2005 Stormwater Manual for Western WA • EDDS – Engineering Design & Development Standards • LID – Low Impact Development • NPDES – National Pollutant Discharge Elimination Permit • SWPPP – Stormwater Pollution Prevention Plan • WWHM: Western WA Hydrology Model