1 / 16

Implementing ISO 15926 and iRING at Bechtel The Power of Collaboration

Implementing ISO 15926 and iRING at Bechtel The Power of Collaboration. Digital Plant 2010 Houston March 1-3, 2010. Robin Benjamins. Our Information Landscape. Static Requirements (Institutionalized). Legend. Cost Data. Quantity Data. Corporate Systems. Owner Operator.

jake
Download Presentation

Implementing ISO 15926 and iRING at Bechtel The Power of Collaboration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementing ISO 15926 and iRING at BechtelThe Power of Collaboration Digital Plant 2010 Houston March 1-3, 2010 Robin Benjamins

  2. Our Information Landscape Static Requirements (Institutionalized) Legend Cost Data Quantity Data Corporate Systems Owner Operator Schema Configuration Suppliers Project Commercial Systems JV Partners Engineering & Construction Systems Dynamic Requirements (Customer Driven)

  3. Automation Investment Always Changing COTS Proprietary Open Source Systems & Infrastructure Technology Proprietary Information Model (ISO 15926) Application Mapping Public Always Extending Always Compatible

  4. Standards Strategy Engineering Procurement Construction Contracts Project Controls Startup Bechtel ISO 15926 “Lingua Franca” Internet EDI CIS/2 / IFC AEX XMpLant ISO 15926 Bank Steel Fabricator Equipment Manufacture Heater Manufacture JV EPC

  5. Information Ambiguity Greatest Least Ambiguity • Data exchanges operate most successfully when ambiguity is eliminated • Ambiguity between exchanging partners can require significant effort (labor) to remove • The higher the ambiguity, the higher the cost to implement effective and efficient data exchanges • Ambiguity = Cost Knowledge Ambiguity Scale Compliance iRING 2.0 Implementation ISO 15926 iRING 1.0 Implementation Information XMpLant Schema Implementation Least Compliance Comma Delimited File Greatest Ambiguity Data

  6. Robin Benjamins Bechtel FIATECH Technology Conference and Showcase Las Vegas, April 6-8, 2009

  7. Camelot Project • To build and deploy an ISO 15926, open source infrastructure on the internet and to show the following capabilities: • The use of ISO 15926 in modeling business information • The setup, configuration, and use of publicly available tools to map legacy systems to ISO 15926 • The demonstration of several data exchange scenarios between several companies using ISO 15926 over the internet

  8. Camelot Participants • Camelot was an industry collaboration project ( POSC Caesar/FIATECH, IDS-ADI) • Companies that participated in Camelot: • Bechtel • Bentley • Chevron • Consolidated Contractors Company (CCC) • DNV • Dow • DuPont • Emerson Process Management • Fluor • Hatch • Intergraph • NRX Global • Tata Consultancy Services (TCS) • Zachry

  9. Demonstration Landscape Bentley NRX PlantSpace P&ID Excel OpenPlant Class Editor RDS/WIP System Brisbane Pune Hatch P&ID Valve, Line, In-line Instrument, and Vessel Emerson iRING Web Service SmartPlant Foundation OpenPlant PowerPID Huntsville Intergraph ISO 15926 Information Model Frederick Bechtel iRING Web Service Internet Houston RDS/WIP Dow SmartPlant P&ID C3D Oslo Wilmington Athens RDS/WIP Editor Email CCC DuPont OpenPlant PowerPID TCS

  10. Reporting Architecture RDS/WIP PSN Portal Ad-hoc Update Request Ad-hoc Update Request JV Partner Interoperability Service (ISO 15926) PSN Portal Bechtel Secured Access Control Secured Access Control BizTalk or other Web Service SSRS SSAS SS.. Reporting Database ISO 15926 Adapter Application (typ)

  11. Implementing ISO 15926 at EmersonCollaboration is Essential Duane Toavs Digital Plant 2010 Houston, March 1-3, 2010

  12. Standard Dilemma

  13. Interoperability is the Objective End User Project Deliverables Robin was right!  EPCMain Contractor Emerson RMT PSS Fisher Device Manager EPCSub Contractor

  14. Implementing ISO 15926 is the Solution Internal External Client App Rosemount Fisher DeltaV AMS Interface iRING - Adapter Legacy Database Emerson Database Adapter Adapter – XML Adapter – Excel Adapter – Excel ASE Adapter Service InBox Interface Service Emerson Project Gateway Adapter iRing Reference Browser iRING - Adapter Adapter Adapter Service ISO-15926 RDF InBox Interface Service iRING - Adapter Data Model Adapter Interface Service Reference Database Vocabulary – RDF Data Dictionary – ISO-15926 Part2,4,7 iRing Reference Browser

  15. Bechtel Customer, Owner/Operator Interoperability Strategy other BSAPs other BSAPs other BSAPs SP P&ID SPI Other apps ISO 15926 SP 3D iRING O&M SPF PSN Portal ERP Procurement LCIM Construction ECM InfoWorks BecGIS PSN 2.0 Other apps Other apps 3D P&ID Procurement 3D LCIM Procurement ECM GIS ERP ECM Suppliers JV Partners JV Partners JV Partners

  16. www.iringug.org

More Related