1 / 10

Transportation Planning Overview And Demand Forecasting Case Study

Transportation Planning Overview And Demand Forecasting Case Study. George Mason University [CEIE 462/562] Dr. Mohan Venigalla Guest Speaker: Mr. Kanti Srikanth Feb. 18, 2008. Planning Context. Types of plans System / Corridor / Project Plan Duration Immediate / Short / Long

Download Presentation

Transportation Planning Overview And Demand Forecasting Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transportation Planning Overview And Demand Forecasting Case Study George Mason University [CEIE 462/562] Dr. Mohan Venigalla Guest Speaker: Mr. Kanti Srikanth Feb. 18, 2008

  2. Planning Context • Types of plans • System / Corridor / Project • Plan Duration • Immediate / Short / Long • Purpose of plans • Implementation / Strategy or Policy Development • Plan Content • Multi or Uni Modal / Framework / Targets /Design / Mitigation

  3. Types of Transportation Plans • Motivator: • Mandatory / Funding / Coordination / Specific Need • Planning Level: • Statewide • VDOT: 2025 State Highway Plan, VTRANS 2025 • Sub-Regional • NoVA: Transaction 2030 / N VTA Six Year Plan / VDOT P&R Plan / VDOT Regional Bikeway & Trail Plan • Regional / Metropolitan Area wide • NCRTPB: 2007 CLRP / FY 2008-2013 TIP • Local • NoVA: Comprehensive Plans, Corridor Plans • Ex: Fairfax County Comprehensive Plan – Transportation Element

  4. Planning Case Study: Improvements to the Capital Beltway (I 495) • Type: EIS • Duration: Short and Long term • Purpose: Identify roadway improvements to address congestion and enhance mobility in the corridor • Plan Content: Purpose & Need; Current Conditions; Forecast Demand; Forecast Operating conditions; Alternative solutions; Locally preferred alternative; Mitigation elements; Conceptual design.http://www.virginiadot.org/projects/hot_495.asphttp://project1.parsons.com/capitalbeltway/docs/FinalEIS.pdf

  5. Planning Case Study: Improvements to the Capital Beltway (I 495) (continued) • Selected EIS Contents (FEIS document page numbers): • Study area characteristics: 47,49,51,95,96,97 • Need for improvements: 52 – 54, 56 • Land Use 57-59,134,135,137-139,144,151,153,157 • Traffic Demand: 92-102, 104-106, 107-109 • Alternatives: 62,64,65,68,73-81 • Some of the Environmental Considerations: 132/206 • Air Quality: 169,170,172,218 • Noise: 178,184,228 • Water: 190,256,258

  6. Planning Case Study: Improvements to the Capital Beltway (I 495) (continued) • Focus: Travel Demand Modeling • Trip Generation • Rates – Auto ownership, Income levels, HH size • Trip Distribution • Housing / Employment locations • Modal alternatives (SOV, HOV, Bus, Rail, Water) • Mode Split • Congestion levels / travel time / costs • Traffic Assignment • Operational mandates/constraints • Traffic and Revenue Estimates • Terms of project financing

  7. THANKS Kanti Srikanth Regional Transportation & Air Quality Liaison VDOT-NoVA District Kanathur.Srikanth@VDOT.Virginia.Gov

  8. Types of Plans: Selected Resourcese • Statewide • VDOT: 2025 State Highway Plan, VTRANS 2025 • http://virginiadot.org/projects/resources/Virginia2025StateHighwayPlanTechReport.pdf& NoVA Map: http://virginiadot.org/projects/resources/nova.pdf • http://www.vtrans.org/ • Sub-Regional • NoVA: Transaction 2030 / NVTA 6 Year Plan / VDOT P&R Plan / VDOT Bike & Trail Plan • http://www.thenovaauthority.org/transpublications.html • http://www.thenovaauthority.org/PDFs/Press%20Releases/1%2011%2008%20six%20year%20plan%20approval%20and%20Mason%20appointment%20PRESS%20RELEASE.pdf • http://virginiadot.org/projects/northernvirginia/northern_virginia_park-and-ride_feasibility.asp • http://www.fhiplan.com/novabike/ • Regional / Metropolitan Area wide • NCRTPB: 2007 CLRP / FY 2008-2013 TIP • http://www.mwcog.org/clrp/default.asp • http://www.mwcog.org/clrp/projects/tip/fy0813.asp • Local • NoVA: Comprehensive Plans, Corridor Plans • Ex: Fairfax County: Plan Document: http://www.fairfaxcounty.gov/dpz/comprehensiveplan/ and Transportation Map: http://www.fairfaxcounty.gov/fcdot/pdf/transplan/tpm2006v3.2.pdf