130 likes | 240 Views
Re-use, recycling and future of demolished buildings. By: Frank Teeuwssen Luuk Mudde Niek Fassaert. Waste management on construction sites. Dutch Green Building Council Occasions Criterion. Examples. Occasion: The builder is requierd to minimalize building waste
E N D
Re-use, recycling and future of demolished buildings By: Frank Teeuwssen LuukMudde NiekFassaert
Waste management on construction sites • Dutch Green Building Council • Occasions • Criterion
Examples • Occasion: The builder is requierd to minimalize building waste • Criterion: The must have a VCA certification
Security • Health • Environment • Checklist VCA Veiligheid, gezondheid en milieu Checklist Aannemers
Material Seperation • Dumping ground • Containers • Gamma construction waste management service
Rate of recycling 98% >99%
Reuse parts of buildings • 95% recycled • 19 million ton a year • 90% stony waste • 100% reused • Mostly road construction
Reuse for new buildings • Increase demand old houses • old facades and fireplaces • Canal houses and old farms
National laws and regulations Preferred sequence: Prevention > recycling > incineration> deposit
Can be forbidden: Incineration and deposit Production and import • May be required: Retake and remove products Waste separation Spatial Planning and Environment Rules EU
Future plans • Increase recycling by 1% • Mostly stone and PVC
PVC: • Sustainable procurement • Formulation of quality criteria and / or label • Stimulation of accessible collection • Developing a communication strategy • Carrie out a pilot for the use of PVC recyclateframes
Application • Like marktplaats.nl • Commercialize superfluously purchased construction material • Softwood instead of tropical wood