Interfacing with the Automatic Induction for the AFSM-100 MTAC #96

Interfacing with the Automatic Induction for the AFSM-100 MTAC #96. Mike Winn Dave Williams Industry Co-Chair Postal Co-Chair. Status of Automatic Induction (Ai) Upgrades. Phase 1 Deployment Schedule Purchased 210 Systems for 59 Sites Installation: October 29, 2005 – September 30, 2006

johana
Download Presentation

Interfacing with the Automatic Induction for the AFSM-100 MTAC #96

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interfacing with the Automatic Induction for the AFSM-100MTAC #96 Mike Winn Dave Williams Industry Co-Chair Postal Co-Chair

  2. Status of Automatic Induction (Ai) Upgrades • Phase 1 Deployment Schedule • Purchased 210 Systems for 59 Sites • Installation: October 29, 2005 – September 30, 2006 • 112 Systems Accepted • On Schedule • Phase 2 Program • Approved by Board of Governors on May 3, 2006 • Funding for 145 Additional Ai Systems • Deployment: January – December 2007

  3. Bundle Breakage Cost Analysis • Workgroup Telecom on May 4, 2006 • Helped Define Opportunity for Savings • Examined Various Components • Workgroup Taking Total System Approach to Costs • Focus on Lowest Combined Costs for Industry and Postal Operations

  4. Explore Different Solutions Parallel Paths to New Environment • Maximize Efficiencies of Postal Processing – Use Flats Container That Permits Direct Induction into AFSM-100 • Minimize Costs of Mailer Preparation – Use Existing Industry Technology That Yields Output for Ai

  5. Tests for Alternative Flat Mail Preparation 1. -“Dolly Dock” Test – July 2006 • Mailer Puts Loose Flats in Automation Compatible Trays (ACT) • Mailer loads ACTs on Dolly Docks • Mailer Transports to Southern Maryland Processing and Distribution Center • ACTs Automatically Removed and Inducted Off Dolly Docks into Ai on AFSM-100

  6. Automation Compatible Tray (ACT) AUTOMATION COMPATIBLE TRAY

  7. Tests for Alternative Flat Mail Preparation • Auto Prep Test – August 2006 • Automates De-bundling of Strapped Bundles Off Pallets • Places Loose Flats into ACTs • Automates Loading of ACTs onto Dolly Docks • Inducts Dolly Docks into Ai

  8. Proposed Pallet for Auto Prep Scheme 1 Scheme 2 • Straps Only • Non-Compensated Bundles

  9. Calendar • Plan Visit to Southern Maryland P&DC for “Dolly Dock” Test Around July 2006 • Schedule Next MTAC Meeting for August 2, 2006 from 8:00-10:00 a.m.

  10. Questions?