1 / 9

Job Shop, Flow Shop, and Batch Processing

Job Shop, Flow Shop, and Batch Processing. Facility Layout : Job Shop. Product 1. Product 2. Output. A. B. Input. C. D. Job Shop (Functional Layout).

johana
Download Presentation

Job Shop, Flow Shop, and Batch Processing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Job Shop, Flow Shop, and Batch Processing

  2. Facility Layout : Job Shop Product 1 Product 2 Output A B Input C D

  3. Job Shop (Functional Layout) Functional layout: similar resources in the same department. Ex. all press machines are located in stamping department. Ex. Bakeries, law firms, emergency rooms, repair shops. • low volume, high variety customized products • flexible resources • skilled human resources • jumbled work flows • high material handling • large volume of inventories • long flow time • highly structured information system • high cost per unit of product but low investment

  4. Facility Layout : Flow Shop Product 1 Product 2 A D B Input Output C B A

  5. Flow Shop (Product Layout) Product layout or line layout: Resources are arranged according to the sequence of the operations. Usually requires duplication ( and investment) of a resource pool; dedication of resources. Discrete flow shop; assembly line, Continuous flow shop; beverage. • high standardization, high speed • low material handling, short flow time • low flow unit processing cost • high investment cost; needs mass production. • special purpose equipment, and low skilled labor prevent flexibility Most processes fall somewhere on the continuum between Job Shop and Flow Shop; batch processing.

  6. The Product-Process Matrix • Positions outside the diagonal signal misalignment. Three­star chefs who serve simple meals (burritos and tacos) with their highly flexible job shop process incur high opportunity costs. Substantial savings would result from changing resources (including chefs) and streamlining the process into a flow shop. • Asking Chipotle's to change its menu daily would require high changeover costs. Asking it to deliver a three-star dining experience is virtually impossible.

  7. The Product-Process Matrix • Whereas the strategic operational audit is a high­level tool for improving fit, the product-process matrix focuses on the match between process technology and delivered product attributes. • The product-process matrix starts by evaluating the promised value proposition and the process used to deliver value. It verifies alignment along one dimension, often by comparing the degree of variety in the value proposition with the degree of process flexibility. This combination is then represented by a covered area in the matrix where the distance to the diagonal represents the degree of misalignment.

  8. Matching Process Choice with Strategy: Product-Process Matrix Process Flexibility High JOB SHOP Jumbled Flow. Process segments loosely linked. (Commercial Printer, Architecture firm) BATCH Disconnected Line Flow/Jumbled Flow but a dominant flow (Heavy Equipment, Auto Repair) Opportunity exists. Costs FLOW SHOP Connected Line Flow (assembly line) (Auto Assembly, Car lubrication shop) Continuous, automated, CONTINUOUS rigid line flow. Out-of-pocket Process segments tightly FLOW Costs linked. Low (Oil Refinery) Product Variety High Low Low Standardization High Standardization Commodity Products Few Major Products One of a kind Low Volume Many Products High volume

  9. Matching Process Choice with Strategy: Product-Process Matrix Process Flexibility High JOB SHOP Jumbled Flow. Process segments loosely linked. (Commercial Printer, Architecture firm) BATCH Disconnected Line Flow/Jumbled Flow but a dominant flow (Heavy Equipment, Auto Repair) Opportunity exists. Costs FLOW SHOP Connected Line Flow (assembly line) (Auto Assembly, Car lubrication shop) Continuous, automated, CONTINUOUS rigid line flow. Out-of-pocket Process segments tightly FLOW Costs linked. Low (Oil Refinery) Product Variety High Low Low Standardization High Standardization Commodity Products Few Major Products One of a kind Low Volume Many Products High volume A similar graph can be prepared to show the relationship between process flexibility and cost, or process flexibility and response time, but not for quality.

More Related