Integrated Cable Management Systems. Crosstrack: a Totally New Concept. Efficient, Cost Effective. Integrated Access Flooring. Integrated Access Flooring. • Premium flooring grade deck printed to identify cable ducts. • Load bearing deck fastened at 6 points to base.
E N D
Integrated Access Flooring • Premium flooring grade deck printed to identify cable ducts • Load bearing deck fastened at 6 points to base • Exceeds AS 1170.1 by 492.5 kPa • Accommodates flush-with- floor outlet boxes
Integrated Access Flooring • Premium flooring grade deck printed to identify cable ducts • Load bearing deck fastened at 6 points to base • Exceeds AS 1170.1 by 492.5 kPa • Accommodates flush-with- floor outlet boxes
Integrated Access Flooring • Premium flooring grade deck printed to identify cable ducts • Load bearing deck fastened at 6 points to base • Exceeds AS 1170.1 by 492.5 kPa • Accommodates flush-with- floor outlet boxes
Integrated Access Flooring • Premium flooring grade deck printed to identify cable ducts • Load bearing deck fastened at 6 points to base • Exceeds AS 1170.1 by 492.5 kPa • Accommodates flush-with- floor outlet boxes
Integrated Access Flooring • Premium flooring grade deck printed to identify cable ducts • Load bearing deck fastened at 6 points to base • Exceeds AS 1170.1 by 492.5 kPa • Accommodates flush-with- floor outlet boxes
Integrated Access Flooring • Moulded polypropylene base fixed to slab at 16 points • Automatically self levels on uneven slabs • Power and telecommunications run lengthways and crossways • No crossover bridges, metal conduits or separate cable trays • Each service separated by at least 50mm - no electromagnetic interference • Wiring can be grouped and secured at regular intervals
Integrated Access Flooring • Moulded polypropylene base fixed to slab at 16 points • Automatically self levels on uneven slabs • Power and telecommunications run lengthways and crossways • No crossover bridges, metal conduits or separate cable trays • Each service separated by at least 50mm - no electromagnetic interference • Wiring can be grouped and secured at regular intervals
Integrated Access Flooring • Moulded polypropylene base fixed to slab at 16 points • Automatically self levels on uneven slabs • Power and telecommunications run lengthways and crossways • No crossover bridges, metal conduits or separate cable trays • Each service separated by at least 50mm - no electromagnetic interference • Wiring can be grouped and secured at regular intervals
Integrated Access Flooring • Moulded polypropylene base fixed to slab at 16 points • Automatically self levels on uneven slabs • Power and telecommunications run lengthways and crossways • No crossover bridges, metal conduits or separate cable trays • Each service separated by at least 50mm - no electromagnetic interference • Wiring can be grouped and secured at regular intervals
Integrated Access Flooring • Moulded polypropylene base fixed to slab at 16 points • Automatically self levels on uneven slabs • Power and telecommunications run lengthways and crossways • No crossover bridges, metal conduits or separate cable trays • Each service separated by at least 50mm - no electromagnetic interference • Wiring can be grouped and secured at regular intervals
Integrated Access Flooring • Moulded polypropylene base fixed to slab at 16 points • Automatically self levels on uneven slabs • Power and telecommunications run lengthways and crossways • No crossover bridges, metal conduits or separate cable trays • Each service separated by at least 50mm - no electromagnetic interference • Wiring can be grouped and secured at regular intervals
Integrated Access Flooring • Moulded polypropylene base fixed to slab at 16 points • Automatically self levels on uneven slabs • Power and telecommunications run lengthways and crossways • No crossover bridges, metal conduits or separate cable trays • Each service separated by at least 50mm - no electromagnetic interference • Wiring can be grouped and secured at regular intervals
Crosstrack has Delivered for Over 200 Organisations • An easy to install, rock-solid and level load bearing floor • Cost efficient to lay at 300m2 in a day • A more quiet, comfortable and stable floor than pedestal type complete with an integrated, flexible cable management system for current and future needs • Maintenance-free for the life of the building
Crosstrack has Delivered for Over 200 Organisations • An easy to install, rock-solid and level load bearing floor • Cost efficient to lay at 300m2 in a day • A more quiet, comfortable and stable floor than pedestal type complete with an integrated, flexible cable management system for current and future needs • Maintenance-free for the life of the building
Crosstrack has Delivered for Over 200 Organisations • An easy to install, rock-solid and level load bearing floor • Cost efficient to lay at 300m2 in a day • A more quiet, comfortable and stable floor than pedestal type complete with an integrated, flexible cable management system for current and future needs • Maintenance-free for the life of the building
Crosstrack has Delivered for Over 200 Organisations • An easy to install, rock-solid and level load bearing floor • Cost efficient to lay at 300m2 in a day • A more quiet, comfortable and stable floor than pedestal type complete with an integrated, flexible cable management system for current and future needs • Maintenance-free for the life of the building
Crosstrack has Delivered for Over 200 Organisations • An easy to install, rock-solid and level load bearing floor • Cost efficient to lay at 300m2 in a day • A more quiet, comfortable and stable floor than pedestal type complete with an integrated, flexible cable management system for current and future needs • Maintenance-free for the life of the building
Crosstrack has Delivered for Over 200 Organisations • Continuous cabling with partition walls on top • Conforming to national wiring codes and telecommunications cabling standards • Minimum down time through easy-access cable alterations or upgrades/refits • A system warranted for 15 years - longer than any competitor
Crosstrack has Delivered for Over 200 Organisations • Continuous cabling with partition walls on top • Conforming to national wiring codes and telecommunications cabling standards • Minimum down time through easy-access cable alterations or upgrades/refits • A system warranted for 15 years - longer than any competitor
Crosstrack has Delivered for Over 200 Organisations • Continuous cabling with partition walls on top • Conforming to national wiring codes and telecommunications cabling standards • Minimum down time through easy-access cable alterations or upgrades/refits • A system warranted for 15 years - longer than any competitor
Crosstrack has Delivered for Over 200 Organisations • Continuous cabling with partition walls on top • Conforming to national wiring codes and telecommunications cabling standards • Minimum down time through easy-access cable alterations or upgrades/refits • A system warranted for 15 years - longer than any competitor
Crosstrack has Delivered for Over 200 Organisations • Continuous cabling with partition walls on top • Conforming to national wiring codes and telecommunications cabling standards • Minimum down time through easy-access cable alterations or upgrades/refits • A system warranted for 15 years - longer than any competitor
Leading Technology Companies and Specifiers Endorse Crosstrack "...we thought hard about issues such as cable capacity, but we're very pleased, Crosstrack handled all the cable we'd ever want to run." Peter O'Keefe Technical Services Manager Australian Defence Force Academy
Leading Technology Companies and Specifiers Endorse Crosstrack "We switched to Crosstrack because our previous access floor couldn't handle all the cables we needed, but Crosstrack can, and switching was the best decision we ever made." Godfrey Gamble Building and Security Services Apple Computer Australia
Leading Technology Companies and Specifiers Endorse Crosstrack "Cable management will continue to be an issue in the foreseeable future. Crosstrack's solution is simple and elegant with the cable trays, supports and covers integrated in one compact unit." James Calder Principal, Strategic Facilities Planning Woods Bagot Architects Australia
Leading Technology Companies and Specifiers Endorse Crosstrack "The use of this flooring has saved many thousands of dollars and significant disruption to the store." Michael Phillips Project Director Dick Smith Electronics Powerhouse Stores
Leading Technology Companies and Specifiers Endorse Crosstrack
Crosstrack is Ideal for Refurbishments Including Heritage Projects
Crosstrack Delivers Economically • $85 per square metre fully installed • 1 - 2% of total project cost • Maintenance-free for the life of the building • Earlier project completion • Earlier letting/occupancy • Higher occupancy ratio • Reduced turnover of tenants
Crosstrack Delivers Economically • $85 per square metre fully installed • 1 - 2% of total project cost • Maintenance-free for the life of the building • Earlier project completion • Earlier letting/occupancy • Higher occupancy ratio • Reduced turnover of tenants
Crosstrack Delivers Economically • $85 per square metre fully installed • 1 - 2% of total project cost • Maintenance-free for the life of the building • Earlier project completion • Earlier letting/occupancy • Higher occupancy ratio • Reduced turnover of tenants
Crosstrack Delivers Economically • $85 per square metre fully installed • 1 - 2% of total project cost • Maintenance-free for the life of the building • Earlier project completion • Earlier letting/occupancy • Higher occupancy ratio • Reduced turnover of tenants
Crosstrack Delivers Economically • $85 per square metre fully installed • 1 - 2% of total project cost • Maintenance-free for the life of the building • Earlier project completion • Earlier letting/occupancy • Higher occupancy ratio • Reduced turnover of tenants
Crosstrack Delivers Economically • $85 per square metre fully installed • 1 - 2% of total project cost • Maintenance-free for the life of the building • Earlier project completion • Earlier letting/occupancy • Higher occupancy ratio • Reduced turnover of tenants
Crosstrack Delivers Economically • $85 per square metre fully installed • 1 - 2% of total project cost • Maintenance-free for the life of the building • Earlier project completion • Earlier letting/occupancy • Higher occupancy ratio • Reduced turnover of tenants
Crosstrack Delivers Economically • $85 per square metre fully installed • 1 - 2% of total project cost • Maintenance-free for the life of the building • Earlier project completion • Earlier letting/occupancy • Higher occupancy ratio • Reduced turnover of tenants
Crosstrack Delivers Now and in the Future • Provides protection for both copper and fibre • Separates power and data, provides right angle crossovers • Continuous support with no stretching and bend radius controlled • Copes easily with minor/major recabling as well as churn and upgrades • Trend towards more, smaller and dispersed cables • The arrival of category 5e, 6 and 7 and lack of bandwidth of wireless LANs will make cable management critical in the future
Crosstrack Delivers Now and in the Future • Provides protection for both copper and fibre • Separates power and data, provides right angle crossovers • Continuous support with no stretching and bend radius controlled • Copes easily with minor/major recabling as well as churn and upgrades • Trend towards more, smaller and dispersed cables • The arrival of category 5e, 6 and 7 and lack of bandwidth of wireless LANs will make cable management critical in the future
Crosstrack Delivers Now and in the Future • Provides protection for both copper and fibre • Separates power and data, provides right angle crossovers • Continuous support with no stretching and bend radius controlled • Copes easily with minor/major recabling as well as churn and upgrades • Trend towards more, smaller and dispersed cables • The arrival of category 5e, 6 and 7 and lack of bandwidth of wireless LANs will make cable management critical in the future
Crosstrack Delivers Now and in the Future • Provides protection for both copper and fibre • Separates power and data, provides right angle crossovers • Continuous support with no stretching and bend radius controlled • Copes easily with minor/major recabling as well as churn and upgrades • Trend towards more, smaller and dispersed cables • The arrival of category 5e, 6 and 7 and lack of bandwidth of wireless LANs will make cable management critical in the future
Crosstrack Delivers Now and in the Future • Provides protection for both copper and fibre • Separates power and data, provides right angle crossovers • Continuous support with no stretching and bend radius controlled • Copes easily with minor/major recabling as well as churn and upgrades • Trend towards more, smaller and dispersed cables • The arrival of category 5e, 6 and 7 and lack of bandwidth of wireless LANs will make cable management critical in the future
Crosstrack Delivers Now and in the Future • Provides protection for both copper and fibre • Separates power and data, provides right angle crossovers • Continuous support with no stretching and bend radius controlled • Copes easily with minor/major recabling as well as churn and upgrades • Trend towards more, smaller and dispersed cables • The arrival of category 5e, 6 and 7 and lack of bandwidth of wireless LANs will make cable management critical in the future
Crosstrack Delivers Now and in the Future • Provides protection for both copper and fibre • Separates power and data, provides right angle crossovers • Continuous support with no stretching and bend radius controlled • Copes easily with minor/major recabling as well as churn and upgrades • Trend towards more, smaller and dispersed cables • The arrival of category 5e, 6 and 7 and lack of bandwidth of wireless LANs will make cable management critical in the future
Crosstrack Delivers on all Cable Management Criteria • Physical performance • Cabling functionality • Flexibility • The only system which ensures all cabling complies with current regulations, codes and standards