270 likes | 308 Views
Moxa Embedded Solution on IEC 61850. Moxa Systems August, 2009. Theme. IEC 61850 with Smart Grid Substation Automation Empowered By IEC 61850 Moxa Solution Summary. Future of Power: Smart Grid. Everything is now based on electricity Computers, Networks, Telecom, Medical, …
E N D
Moxa Embedded Solution onIEC 61850 Moxa SystemsAugust, 2009
Theme • IEC 61850 with Smart Grid • Substation Automation EmpoweredBy IEC 61850 • Moxa Solution • Summary Confidential
Future of Power: Smart Grid • Everything is now based on electricity • Computers, Networks, Telecom, Medical, … • Electric grid produces at least 40% of CO2 emissions • Aging electric grid contributes a 20% power loss while delivering to end user Confidential
Substation Automation Advanced Metering Infrastructure Distributed Energy Integrated Smart Grid Infrastructure PowerGeneration Customers Transmission Distribution Electricity DispatchingControl Center Source: EPRI Intelligrid Confidential
Electricity consumption, switchboard operation, information gathering, station decision making feedback Grid intelligence strategic decision,T&D automated management Substation Automation in Smart Grid Electricity DispatchingControl Center Substation Source: EPRI Intelligrid Confidential
DNP 3.0 DNP 3.0 ModBus ModBus Current Power Automation Protocols IEC 60870-5 Confidential
Protocol Trend for Power Automation Newton Evans: 2005-2007 • IEC 61850 is the trend • Migrating to Ethernet-based Confidential
DNP 3.0 DNP 3.0 LAN DNP 3.0 DNP 3.0 LAN ModBus/TCP ModBus/TCP Future Power Automation Protocols IEC 60870-5 IEC 61850 ModBus ModBus Confidential
Substation Automation EmpoweredBy IEC 61850 Confidential
Benefits of IEC 61850 Power Substation Protocol Integration Time to Market Easy Maintenance IEC 61850 Confidential
Moxa Offering Confidential
Moxa Embedded Solution Confidential
PASS! DA-681-I-DPP-TIEC 61850-3 Test Lead with IEC61850-3 CertifiedEmbedded Computer – DA-681 Confidential
Using DA-681 in IEC61850-3 Substation • Requirements • IEC61850-3 certified hardware • Multiple LANs to connect IED device and communicate dispatch control center • Requires 100-240 AC/DC power input • 19-inch rackmount, fanless design • Benefits • The DA-681 has 6 LANs for network redundancy and centralized communication • Excellent patented heat dissipation design for use in • -40 ~ 75˚C environments • Serial port with isolation protection for integrating legacy RTU into IEC 61850 substation • Dual power design to connect simultaneously to 100 VDC and 240 VAC power sources Confidential
Features Briefing • Intel x86 1GHz CPU with 910GMLE chipset • Built-in DDR2 SDRAM and industrial-grade DOM • 19-inch rackmount installation, 1U high • 6 Ethernet ports for network redundancy • 2 USB 2.0 Host, supporting system boot up • 4 Serial 232 & 8 RS-485 ports (wide baud rate) • CF/SATA interfaces for storage expansion • 100 to 240V AC/DC power input • Dual power for redundant application (DP/DPP model only) • Fanless and low power consumption design Confidential
Challenges to Certify IEC 61850-3 Function Test EMC Test Wide Temperature Test Anti-Vibration Test Confidential
Unique Design to Conquer EMC Test Confidential
Thermal Placement Optimization of Components Natural-Convection Chamber to Test Wide Temperature Components Database Optimal Heat TransferMethods Self Warming System Wide Temperature Know-How Confidential
Special Heat Dissipation Design L-Type for Heat Dissipation Confidential
System Throttling Design • High Temperature Solution: Dynamic Throttling Technique Safe User Configurableinside BIOS time Confidential
120 hours Uninterrupted Testing Confidential
Production Quality Management (Dynamic Burn-in) High temp. (55~75dc) Pilot Run 24~48hrs Room temp. (30~40dc) Mass Production 4~24hrs Wide temp. (-40~85 dc) W/T Product screen 24 hrs • Over 80% function test items are covered during burn-in test program. • Monitoring programs control the entire burn-in status, and show the data for analysis. Confidential
Anti-Vibration Tolerance Test 50 G Anti-Shock5-500 MHz Anti-Vibration Confidential
Summary • IEC 61850 is the trend in modern power substation to integrate different standards in Relay, Control, and Metering equipments • DA-681 is the best solution to fit in “Communication Processor” and “Back-end Host” Confidential
Thanks! Confidential