ATLAS & D0

ATLAS & D0. D0: Status, software & analysis Frank Filthaut & Silke Duensing ATLAS: Software & analysis Stan Bentvelsen Silicon tracker Simon Peeters  -spectrometer End-cap toroids MDT chambers Electronics Alignment Detector control Data-acquisition.

kaipo
Download Presentation

ATLAS & D0

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATLAS & D0 D0: Status, software & analysis Frank Filthaut & Silke Duensing ATLAS: Software & analysis Stan Bentvelsen Silicon tracker Simon Peeters -spectrometer End-cap toroids MDT chambers Electronics Alignment Detector control Data-acquisition F. Linde, 14-December-2001, Amsterdam

  2. End-cap Toroids: Coils HMA power systems Job: wind & impregnate 28 coils Status: prototype coil exists Outlook: end-cap # 1: 2004? end-cap # 2: 2005? } cost overrun claims

  3. End-cap Toroids: Vessels Schelde Exotech Job: 2 vacuum vessels Status: end-cap # 1 delivered to CERN Outlook: end-cap # 2: summer 2002

  4. Drift Tubes

  5. MDT Chambers r.m.s. wire sag contribution X-ray tomography

  6. Electronics: Alignment Job:  5,000 RASNIK alignment systems + DAQ + software Status:  masks, lenses and CCDs distributed  DAQ & software prototyped and in use “everywhere” Outlook:  complete in 2004 (not critical) off-chamber on-chamber MasterMux USA15Mux lens multiplexer CCD mask

  7. Electronics: Detector Control Job:  1,200 CAN based detector control systems + DAQ + software Status:  T-sensors delivered; 3D B-sensors prototyped  CAN nodes pre-series to be distributed  DAQ & software prototyped Outlook:  complete in 2003 (not critical) on-chamber CAN Network T-sensors 30/chamber T0.2 oC B-sensors B/B10-4 extra bus (insurance) digital busses to MDT front-end

  8. Electronics: Data-Acquisition TDC 1 TDC 1 CSM CSM 18 x 18 x TDC 18 TDC 18 on MDT chambers off MDT chambers USA15 Surface MROD (NIKHEF) (256) ROB (256) CSM-Link 1.28 Gbit/s S-Link to ROB 6 x CSM-Link ROD or ROB “OUT” CSM ROD or ROB “IN”

  9. Cosmic-Ray Test • Objectives: • system test! • Develop: • DCS, DAQ • C++ software

  10. Merry Christmas