140 likes | 227 Views
Virginia CBP Non-tidal Network: 2006 Status Update. Cooperative partners: VADEQ USGS. 2006 VA Non-tidal Network Sites. (Primary). (Primary). Primary Sites CY 2006. 10 sites (5 RIM, 5 RIM2) 8 sampled by USGS only 2 sampled DEQ interval/USGS storm events
E N D
Virginia CBP Non-tidal Network: 2006 Status Update Cooperative partners: VADEQ USGS
2006 VA Non-tidal Network Sites (Primary) (Primary)
Primary Sites CY 2006 • 10 sites (5 RIM, 5 RIM2) • 8 sampled by USGS only • 2 sampled DEQ interval/USGS storm events • All sites collected via CBP methods
Total Nitrogen Particulate Nitrogen Total Dissolved Nitrogen Dissolved Nitrate-Nitrite Dissolved Nitrite Dissolved Nitrate Dissolved Ammonium Dissolved Organic Carbon Particulate Inorganic Carbon Particulate Organic Carbon Total Phosphorus Dissolved Orthophosphorus Total Dissolved Phosphorus Particulate Phosphorus Particulate Inorganic Phos. Dissolved Silica Total Suspended Solids Fixed Suspended Solids Volatile Suspended Solids Lab Turbidity Chlorophyll a RIM Primary Site Analytical Parameters
Total Nitrogen Total Nitrate-Nitrite Total Ammonium Total Phosphorus Dissolved Orthophosphorus Total Suspended Solids Fixed Suspended Solids Total Kjeldahl Nitrogen DEQ only SSC-C USGS Storm events only RIM2 Primary Site Analytical Parameters
Sample Summaries for Primary Sites Collected FY2005 and FY2006
Primary Site Changes in 2006 • New gage installation completed on James River at Blue Ridge Parkway site. • Data on line on USGS NWIS site 02024752 • James River site 2-JMS117.35 relocated to 2-JMS113.20 for safety reasons. • Gage will stay the same
Secondary Sites • 18 Sites in CY 2006 • all CBP methods • Final two sites implemented May 2006 • 2 sites dropped for safety concerns • Goose Creek • Cedar Run • 2 sites relocated/no change in gage • Station 3-RPP147.10 moved to 3-RPP147.49 • Station 8-MPN094.79 moved to 8-MPN094.94
Total Nitrogen Total Nitrate-Nitrite Total Ammonium Total Phosphorus Dissolved Orthophosphorus Total Suspended Solids Fixed Suspended Solids Total Kjeldahl Nitrogen Secondary Site Analytical Parameters
2006 CBP Method Implementation • Northern Regional Office dropped 2 stations in June and implemented 2 in February • Goose Creek and Cedar Creek dropped • Rappahannock and Mattaponi implemented • 3 sites implemented by Piedmont regional office in May (one primary and two secondary) • Delay caused by need for specialty equipment
2007 Challenges • VDOT Bridge work in progress at Appomattox at Farmville secondary site • May disrupt flow record. • Funding • Current VADEQ and VA-USGS funding fairly safe. • Possible implimentation problems at new sites
2007 Program Expansion • Probable new work • Two new primary sites • North Anna R. to isolate causes of Pamunkey increasing trends in Pamunkey Basin. • Coastal plain station on Chickahominy R.. • Support for continuous monitoring at James, Rappahannock and Pamunkey RIM sites. • Enhanced accuracy of RIM loading estimates and “real/near” time load estimation. • Ideas for additional new work if have funding • New sites in coastal Plain (Piankatank R) • New Sites in Urban N. VA watersheds • Convert secondary to primary