An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capital Cost EstimatingQ&A

  2. Today • Suggest you review • Equipment Costing Folder on CD • Is this real? • What do we do? • How does it work? • Methods of estimating • Using CapCost • What is a “Capital Cost?” • ‘Dealing’ with CapCost limitations

  3. Is This Real ? • Question: • We seem to be applying simplifications and assumptions that this project doesn’t seem very ‘real.’ • Your thoughts?

  4. Question 1: What do we do? • We will use CapCost which integrates • Estimation of equipment costs • Utility costs • Raw material costs and product revenue • Other costs • Profitability analysis • Sensitivity analysis

  5. CapCost • See the material in the CapCost folder • Install the program from the CD that came with the text (run install.html) • View the movies on the CD (run cost.html) with a computer that has speakers and Quicktime (at home or use the TEAM computer) • Run Capcost.xls and look through it

  6. How Does It Work?

  7. Equipment Purchase Price Equipment Factors “Off Sites” Cost Direct Field Labour (DFL) Direct Field Cost (DFC) 0.25 x DFC 0.25 x DFC Indirect Field Cost (IFC) 1.0 to 1.6 x DFL Home Office Engineering Allowances Total Project Cost (ITC) x Factors

  8. Estimate • DIRECT FIELD COSTS • Equipment Cost • bulk materials (piping, valves, instruments) & labour to install • off-sites (pipe racks, rail spurs …) • INDIRECT FIELD COSTS • engineering, freight, insurance, overhead, const supervision • CONTINGENCY AND FEES • first fill of plant, taxes, duties • escalation TOTAL PROJECT (CAPITAL) COST

  9. Method 1: Lang Factored Estimate Total Capital Cost = Flang * (Sum Of Purchased Cost of Equipment) Flang = 4.74 for fluid processing plant

  10. Method 2: The CapCost Approach Equipment Parameters (Pressure, MOC, Size, Hp …) “Base Cost” = Purchase Cost of Equipment - in Carbon Steel and 0 barg Which One Do We Want? Bare Module Factor = f (Factorpressure, Factormaterial) BARE MODULE COST (Directs and Indirects) - installed equipment in actual materials and actual pressure Module Factor = 1.18 MODULE COST OF PLANT - for expansion to an existing Plant -contingency 15%, fees 3% CHEE 470 Stops Here Grass Roots Factor = 1.30 GRASS ROOTS COST OF PLANT - infrastruction (utilities, off-sites aux. Buildings, product storage, loading and unloading facilities ...)

  11. Determine Equipment Cost Note: Price for Carbon Steel Construction and 0 Bar(g) Fixed Tube exch with 28 m2 = $6500 Convert To Today’s $’s using the CEPCI value

  12. Factor to Today’s Cost $6500 * (1999 CECPI / 1996 CECPI) = today’s cost $6500 x (390.6 / 381.7) = $6650 in 1999

  13. Pressure Factor (Fp) Pressure Factor Fp = 1.14

  14. Material Factor (Fm)

  15. Bare Module Factor FBM Cost of Equipment Installed Fp Fm 1.14 x 3 = 3.42 Therefore FBM = 7 Bare Module Cost = Base Cost x FBM = $6650 x 7 = $46,550

  16. “Module Cost” Of Plant Add Contingency and Fees (building permits, environmental permits etc.) Module Cost = 1.18 S (of Bare Module Cost for all equipment) Module Cost = 1.18 x $46,550 = $ 54,900

  17. Now a Short Demo • A movie to illustrate the capital cost sections of CapCost • One of the sheets in an Excel workbook • The utilities, raw materials and cash flow sections will be covered later in the Economic Analysis workshop

  18. Questions • What do we do when equipment is larger than CapCost can cost? • Split it up into equal sized pieces • Get a cost in CapCost and then apply the capacity factor exponent • new cost=old cost x capacity ratio0.6

  19. Special Equipment • CapCost has an equipment type “User Defined” • If you know the cost of something, you can supply • A name • Equipment cost • Bare Module Cost • Set the first factor to 1, ignore the second

  20. User Defined Equipment

  21. Question • What is a capital cost?

  22. Capital Cost • What’s “Capital ?” • Capital is the money required to build a plant or facility • It’s separated from “Expense” money because of the Tax implications imposed by Revenue Canada, IRS, etc.

  23. Facility Timeline Facility Creation Facility Operation Conceptual Engineering Detailed Engineering & Construction Start-up Expense $ Capital $ Expense $ Expense $ - Operating Expenses -Depreciation Capital Cost

  24. Capital vs Expense • Once the plant is running ‘Expenses’ are small items or costs which are incurred yearly, or have about a 1 year life. • i.e. Software, Office supplies, wages, advertising, heat, lighting, ... • When Calculating Yearly Income Subtract your Expenses From Your Income

  25. Capital vs Expense • ‘Capital’ are expensive items or items which have more than a year of life. • i.e. House, lawnmower, TV, computer, chemical plant equip, first fill of chemicals • Revenue Canada etc. only allow you to subtract a % of the Capital every year to account for the wearing out of the facility (depreciation). • This is called the “Capital Cost Allowance”

  26. Capital vs Expense • Capital Cost Allowance ( CCA ) • Works Like a Bank Account • Revenue Canada allow a % of the remaining asset value to be claimed Remaining Asset Value Time (years)

  27. CCA Classes

  28. Capital vs Expense • Revenue Canada Treat Depreciation per above • More common (?) to treat Depreciation with a straight line for the economic analysis • 10 year depreciation, therefore 10% of capital is ‘expensed’ per year

  29. Taxable Income • Income That’s Taxable (Net Income) Taxable Income = Income - Expenses - CCA • Can’t use CCA if Expenses are greater than Income (can’t use CCA to claim a loss) • CCA can be ‘banked’ for later years where profit is occurring

  30. Small Business Tax- Revenue

  31. Small Business Tax - Expenses CCA

  32. Capital - The Point • Capital is only allowed to be ‘depreciated’ over years and thus it’s ability to minimize taxable income is limited. • Expenses are claimed in the year they’re paid. They’re better for minimizing your taxes. • The Games People play

  33. The Capital Cost Estimate • The tax implications of Capital money requires that you know how much Capital was spent on any asset. • The business financial analysis (NPV etc.) requires that you know the Capital Cost and the Operating Cost well ahead of actually spending any significant amounts of money.

  34. Capital Cost Estimate • Summary: The cost to initially build the facility which will be depreciated over time.

  35. Question: CapCost - arrggh! • CapCost does not change price when we change the maximum pressure. What’s wrong?

  36. Off The Shelf Items • Piping, Valves, Pumps and most equipment have been standarized in design pressures of the connecting Flange • Standards are called 150, 300, 600, 900, 1500, 2500 “lb” flange ratings. • A 150lb rating  150 psig rating, temperature is important in the ultimate strength of the item • Along with standard flanges are standard pipe wall thickness (Sch 40, Sch 80 etc.) ASME Code

  37. Flange Rating

  38. Heat Exchanger Standards • TEMA - Tubular Exchanger Manufacturers Association • dictates minimum requirements for exchanger mechanical design • Legislation does not require TEMA standards be used.

  39. ASME- Pressure Vessel Standards • ASME Code • It started in Chicago after a major explosion in a shoe factory that had a boiler. The boiler explosion caused the government to start regulating pressure vessels (including boilers). • A tool for regulating manufacturers of pressure vessels, heating exchangers, and piping, not pumps, not compressors (no rotating equipment)

  40. ASME- Pressure Vessel Standards • Since the explosion in Chicago codes were developed for the guidance in the calculation of pressure vessels, tables of metal strength vs temp • Safety factor of 4 has historically been applied to the mechanical strength of metal, recently (year 2000) it was reduced to 3.5

  41. ASME Code Sections I - Power Boilers II - Materials (properties i.e. allowable stresses) III - Nuclear Power Plants IV - Heating Boilers V - Non Destructive Examination VII - Guidelines for the Care and Operation of Heating Boilers IX - Welding and Brazing Qualifications X - Fiber-Reinforced Plastic Pressure Vessels XI - Rules for Inservice Inspection of Nuclear Power Plant Components

  42. Minimum Design and CapCost • Allowing CapCost to choose a minimum makes sense since the manufacturer would do the same.

  43. The Final Screen