An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modeling Work GroupStaff Report MWG Meeting August 1, 2011 Web Meeting

  2. COI Flow Analysis and Gridview Comparison • MWG analysis of high COI flows is ongoing • Past emphasis was on comparisons between PROMOD and Gridview, which evolved into attempts to standardize the input and run assumptions. • Currently, focus is on the differences in the generation commitment and dispatch.

  3. Result Comparison Comparison to new GV run by Sherman with loads reduced by 3.4% to back out transmission losses. Note large difference in coal generation.

  4. Most Significant Gen Differences

  5. Annual Energy Difference by Area In general, the trade-off is between coal and combined cycle generation, and appears to be caused by differences in the commitment and dispatch logic. Since the hurdle rates and tie limits effectively separate Alberta from other areas, initial analysis can focus there.

  6. Difference in Alberta (MWh)

  7. Sample AESO Load/Gen (1)

  8. Sample AESO Load/Gen (2)

  9. Sample AESO Load/Gen (3)

  10. Sample AESO Load/Gen (4)

  11. Sample AESO Load/Gen (5)

  12. Sample AESO Load/Gen (6)

  13. Alberta Coal Dispatch - Promod

  14. Hurdle Rates • In PROMOD the hurdle rates represent a financial obstacle that must be overcome to allow economic interchange to occur. • If the marginal price in SR A is $30 and the marginal price in SR B is $25 and the hurdle rate from B to A is $7, there would be no interchange.

  15. TEPPC Hurdle Rates for 2020

  16. Wrap-up and Next meeting • Wrap-up • Next meeting • Need to set date (1st Monday is holiday) • Note TAS meeting is August 8-9

  17. Questions?