1 / 8

D-PE-OE-23 Dell PowerEdge Operate 2023 Exam Questions

With the latest D-PE-OE-23 Dell PowerEdge Operate 2023 Exam Questions from PassQuestion, you will have access to a wealth of valuable information covering all the essential exam topics, giving you the best possible chance of achieving a successful result.

karonchen
Download Presentation

D-PE-OE-23 Dell PowerEdge Operate 2023 Exam Questions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pass DELL EMC D-PE-OE-23 Exam with Real Questions DELL EMC D-PE-OE-23 Exam Dell Technologies PowerEdge Operate 2023 https://www.passquestion.com/D-PE-OE-23.html 35% OFF on All, Including D-PE-OE-23 Questions and Answers Pass DELL EMC D-PE-OE-23 Exam with PassQuestion D-PE-OE-23 questions and answers in the first attempt. https://www.passquestion.com/ 1 / 8

  2. 1.A technician wants to remotely log in to a server but finds that the IDRAC virtual Console feature Is not available. Use the simulator to explore the system. What Is the cause of this Issue? Note: It is necessary to dose (x) the simulator window before you can select a response to this question. A. The Virtual Console is disabled B. Operating system not installed on remote server C. The server has been powered down D. There are more than the maximum number of active sessions Answer: C 2.What is a requirement to operate GPUs in a Dell EMC PowerEdge R740 server? A. All GPU cards must be installed at the same time B. All GPU cards must be of the same type but can be a different model C. All GPU cards must be of the same type and model D. All GPU cards must be installed on the same riser card Answer: C 3.What happens when the Hardware Root of Trust fails to validate the BIOS? A. Boot Guard switches over to the backup BIOS and logs a warning in the system event log. B. Automated BIOS Recovery process recovers the BIOS from the DUP saved in the control panel. C. The server continues running and logs a critical error in the system event log. D. The server shuts down and logs a critical error in the system event log. Answer: D 2 / 8

  3. 4.A technician receives a new server with five drives. They need to configure the drives based on the following requirements received from the administrator: - Drive 0 as a single disk with no RAID - Drives 1-3 as a RAID 5 with drive 4 as a hot spare just for this newly created RAID 5 The administrator plans to add more disks as separate RAID arrays at a later date but only wants drive 4 to be available for this first RAID 5 set. How should the technician configure the drives? A. Set drive 0 to Ready; set drives 1-3 as RAID 5; set drive 4 as a Global Hot Spare B. Set drive 0 to Non-Raid; set drives 1-3 as RAID 5; set drive 4 as a Dedicated Hot Spare C. Set drive 0 to Non-Raid; set drives 1-3 as RAID 5; set drive 4 as a Global Hot Spare D. Set drive 0 to Ready; set drives 1-3 as RAID 5; set drive 4 as a Dedicated Hot Spare Answer: B 5.A technician must update the firmware on a savor, but has no network connectivity. What can the technician use to update the BIOS and iDRAC/ lifecycle Controller firmware? A. OpenManage Server administrator DVD B. ftp dell.com C. NFS share D. USB key with Dell Update Package Answer: A 6.A Dell EMC PowerEdge server has been updated with an LCC and iDRAC DUP to the latest firmware when performing a firmware rollback? A. The LCC can be rolled back; the iDRAC cannot be rolled back B. The iDRAC cannot be rolled back and the LCC cannot be rolled back C. The iDRAC can be rolled back; the LCC cannot be rolled back D. Both the iDRAC and the LCC can be rolled back Answer: D 7.A technician wants to configure the iDRAC on a new server using the iDRAC Quick Sync 2 feature. What is required to use this feature? A. OpenManage Mobile App installed on an Android or iOS device B. OpenManage Mobile App installed on a laptop C. Quick Sync enabled bezel D. iDRAC Enterprise license Answer: A 8.Which is responsible for controlling the NVMe disks, when using a Paddle Card in a PowerEdge 15G server? A. S150 B. HBA355 C. H745 Answer: A 3 / 8

  4. 9.A technician needs to configure a server to allow the OS to manipulate processor frequencies for higher power efficiency. Which setting can they enable to achieve this? A. Logical Processing B. Performance per Watt (DAPC) C. Adjacent Cache Line Prefetch D. Performance per Watt (OS) Answer: D 10.How can a system administrator compare the currently installed hardware to the original system configuration? A. Pull a SupportAssist Collection Comparison Report B. Restore the original System Profile C. View Factory Shipped Inventory D. Export a Tech Support Report Answer: C 11.A server has six memory modules attached to each CPU Memory Optimizer mode is configured. The user now wants to have maximum protection for the memory but cannot afford to lose any memory space. What should the technician install/configure? A. No additional memory Switch on Single Rank Spare Mode B. No additional memory Switch to memory Mirroring C. Six additional memory modules matching the original Switch on Single Rank Spare Mode D. Six additional memory modules matching the original Switch to Memory Mirroring Answer: D 12.Where is the LCD panel located on a Dell PowerEdge 16G server? A. An add-on Server Bezel B. Rear of the server C. Left control panel D. Right control panel Answer: A 13.A technician is trying to troubleshoot a server that constantly keeps raising and lowering the RPMs of the fans. The technician investigates and finds the following: - No errors are displayed - No obvious log entries exist concerning temperatures - Server cover is installed and secured - No expansion cards are installed 4 / 8

  5. What would be the quickest action plan that the technician could attempt to try to fix the issue with the fans? A. Replace all the fans B. Upload the latest iDRAC firmware C. Replace the fans one at a time until the faulty fan is identified D. Adjust the Multi Vector Cooling values Answer: B 14.A technician installs a PCIe card into a server, but the card does not appear in the OS. The server does not have an LCD to display errors, but a light is flashing on the front of the server. What actions can the technician take to troubleshoot the issue? A. Initiate Hardware Stress Test from iDRAC GUI Check PCIe Bus Log for errors B. Run Hardware Diagnostics from Lifecycle Controller Review the Lifecycle Controller log for errors C. Run Hardware Diagnostics from Lifecycle Controller Initiate Hardware Stress Test from iDRAC GUI D. Review the Lifecycle Controller log for errors Check PCIe Bus Log for errors Answer: B 15.What is the minimum number of components, beside the system board, required to POST? A. 1 PSU, 1 DIMM, and 1 CPU only B. 1 PSU, 1 CPU, 1 DIMM, and PERC SAS controller C. 1 PSU and 1 CPU only D. PSUs, CPUs, and DIMMs as configured in BIOS Answer: A 16.Which export type in iDRAC restores a Server Configuration Profile to a known baseline? A. Advanced B. Replacement C. Basic D. Clone Answer: B 17.A technician is setting up SNMP Trap Alerts on a 14G servers. After specifying the trap destination address, what should be the next step? A. Enable the SMNP Client service on the iDRAC B. Include the server OS IP address in the destination systems authentication script C. Enable the SMNP services in the server operating system of the sending server D. Send an SNMP trap test to the destination system Answer: D 18.A technician is installing Windows Server 2016 on a server with RAID 1 and RAID 5 virtual disks. 5 / 8

  6. How should they configure the server and deploy the OS? A. Go to system setup to configure both virtual disks Select the Deploy OS option in the system setup utility B. Go to Settings in the Lifecycle Controller Configure both virtual disks using the guided OS installation method C. Create two virtual disks using the iDRAC UI Access the Lifecycle Controller Go to OS deployment using ‘Deploy OS’ D. Go to the RAID Configuration menu in the Lifecycle Controller Create both virtual disks Go to OS deployment using 'Deploy OS' Answer: C 19.What is the maximum number of CPU cores that can be configured in a Dell EMC PowerEdge R6525 server? A. 56 B. 64 C. 112 D. 128 Answer: D 20.A Dell EMC PowerEdge server logs the following CPU Machine Check error: CPU1 IERR. What action might be required to solve the alert? A. Clear logs B. Update the Intel driver C. Swap the PERC controller D. Reseat the IDSDM Answer: B 21.A technician needs to perform a RAID controller firmware update from within the Operating System. The server runs Red Hat Enterprise Linux and is configured with an iDRAC basic license. Which three steps should the technician take to complete this task? (Choose three.) A. Restart the server and press F10 to start the firmware update process B. After firmware update, run fsck command on the virtual disks C. Obtain the latest firmware update for the RAID controller D. Run racadm fwupdate command from a management station E. Open a command shell and execute the firmware package F. After the firmware update, restart the server Answer: DEF 22.A technician must create a RAID array that uses striping with double parity. Which RAID level must be used? A. RAID 5 B. RAID 10 6 / 8

  7. C. RAID 50 D. RAID 6 Answer: D 23.A technician installs eight servers into a fully operational rack with top of rack switch Each server has a quad 1Gb NIC and redundant power supplies. The company uses iDRAC in shared LOM mode with LOM1 as the selected NIC. What should the technician do to verify iDRAC connectivity on each server? A. iDRAC Datacenter license is installed. B. Ethernet port LOM1 is cabled and the link light is green C. iDRAC dedicated NIC port is cabled and the link light is green D. iDRAC Enterprise license is installed Answer: C 24.Which Dell PowerEdge 16G server has the highest GPU density to run workloads like HPC, AI, DB Analytics, and VDI? A. XR4520c B. XR7620 C. XE8545 D. XE8640 Answer: D 25.A technician in Portland, Oregon has been asked to update the firmware on a server in Omaha, Nebraska. They will use an NFS server also located in Nebraska for serving patches that have been vetted by their security teams. What two pieces of information does the technician need in order to access the NFS patch server from the Lifecycle Controller or iDRAC? (Choose two.) A. Username and password B. CHAP authentication credentials C. IP address or hostname D. Share name Answer: AD 26.A remote technician needs to update the iDRAC with Lifecycle Controller firmware using the iDRAC GUI. They have downloaded the iDRAC firmware to the management station and connected to the iDRAC GUI. What step is required to complete this task? A. Reboot the server to apply the update B. Boot the server into F10 C. Start the Lifecycle Controller and select Firmware Update D. Use the Firmware Update page to upload and install the firmware Answer: D 27.A technician is investigating a server that is reporting that the Lifecycle Controller is disabled during the 7 / 8

  8. power-on procedure. After checking that the system is displaying no other errors, how can the technician re-enable the Lifecycle Controller? A. Access the System Setup utility Select iDRAC Settings and then select Lifecycle Controller Check the Enable option, save, and reboot the server B. Enter the iDRAC GUI Select iDRAC Settings > Lifecycle Controller Check the Enable option and then power cycle the server C. Reboot the server Press F10 during power up and access the Lifecycle Controller GUI Select Power On Messages, select Enable, and reboot the server D. Reboot the server and press Ctrl+L during the power on procedure At the prompt type “LCC-enable” Select save and reboot the server Answer: A 28.A technician wants to install a new version of OMSA onto a server that already has an existing version of OMSA. What is required for this new installation? A. iSM must also be installed on the managed server B. iDRAC firmware needs to be at version 5.0 or higher C. Existing OMSA version must be disabled in Services D. Existing OMSA must be uninstalled before the new version is installed Answer: D 29.Eight new servers have arrived at a datacenter. All use static IP addresses for iDRAC. The technician needs to enable these servers to contact the DHCP server on the network to obtain new IP addresses. What method can the technician use to quickly switch to DHCP? A. Reboot each server to enable DHCP default settings B. Boot into CTRL+S and change iDRAC settings to DHCP C. Use the LCD panel to input a new IP address D. Log in to the iDRAC and enable DHCP Answer: D 8 / 8

More Related