1 / 16

Status of RTH Tokyo

Status of RTH Tokyo. Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of the CBS Expert Team on GTS-WIS operations and implementation (ET-OI) Geneva, 23-26 September 2008. RTH in Region II. NMC in Region II.

kassia
Download Presentation

Status of RTH Tokyo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of the CBS Expert Team on GTS-WIS operations and implementation (ET-OI) Geneva, 23-26 September 2008

  2. RTH in Region II NMC in Region II Khabarovsk 64K Moscow Washington Centre in other region 64K 64K MTN circuit Regional circuit Interregional circuit Additional circuit IMTN-MDCN CIR<32/768K> 24-19.2K (V.34) Toulouse Novosibirsk 512K 14.4-28.8K (V.34) Almaty MPLS 19.2-24K (V.34) via Moscow NI No implementation 14.4-28.8K (V.34) 2M 9.6-26.4K (V.34) NI 768K 28.8-9.6K (V.34) Non-IP link IP link Internet E-mail transmission PyongYang Bishkek Internet Ashgabad Ulaanbaatar via Moscow Tokyo 9.6-26.4K (V.34) 14.4K Baghdad Tashkent 9.6-26.4K (V.34) 64K CMA PCVSAT NI EUMETSAT 1M NI IMTN MDCN MPLS 2.4K 32K Internet 512K MPLS 2M Tehran NI 2M 2M Internet Beijing F/R CIR <16/16K> IMTN MDCN MPLS F/R CIR <32/32K> Dushanbe 2M IMTN MDCN MPLS NI Offenbach 2M IMTN MDCN MPLS 128K Seoul Kabul 50 Thimpu F/R CIR <16/16K> 2M Offenbach NI 512K Kuwait 64K NI 64K 64K 75 100 NI Karachi 64K 2M Hong Kong Internet 128K Internet MPLS New Delhi Bahrain CMA PCVSAT 64K Jeddah 200 Macao Internet ISDN 128K Melbourne 2M 75 CMA PCVSAT 64K Doha MPLS NI 1200 50 Hanoi Internet 128K 1M Kathmandu 100 IMTN MDCN MPLS 50 Abu-Dhabi Internet 64K 64K Moscow Dhaka Internet 128K 64K Algiers Internet Cairo F/R CIR <16/16K> Muscat Vientiane 9.6K Colombo F/R CIR <16/16K> Internet Sanaa Internet 50 IMTN-MDCN CIR<16/32K> 64K Yangon Internet 1200 64K 64K Washington 50 Manila Male Bangkok 64K Internet Phnom Penh Melbourne 75 F/R CIR <16/16K> F/R CIR <16/16K> Singapore Kuala Lumpur Regional Meteorological Telecommunication Network for Region II (Asia) Current status as of May 2008 1. Current status of the GTS -Region II (Asia)-

  3. PCCW FR Network DACOM FR Network PLDT FR Network CAT FR Network 2. GTS links connected with RTH Tokyo MTN 64kbps 128kbps Regional circuits Hong Kong Bangkok Khabarovsk 64kbps KDDI FR Network 64kbps Washington Manila Beijing Seoul Seoul Tokyo Frame Relay (FR) Network-to-network Interconnections New Delhi 192kbps Hong Kong Regional Telecommunication Hub (RTH) Tokyo 1.5 Mbps 1Mbps Manila Bangkok 64 kbps BT FR Network (Cloud I) OBS MPLS Network (Cloud II) Melbourne 1.5 Mbps 128 kbps 256 kbps Khabarovsk 2 Mbps • All links are being operated on TCP/IP basis. • Six of nine are IP over Frame Relay. • Two of nine are MPLS. Dedicated line connections New Delhi Beijing Melbourne Washington Improved MTN (Two Seamless Networks)

  4. 3. Implementation status of GTS circuits

  5. Washington Tokyo 1.5Mbps 1.5Mbps CIR=32kbps FR CIR=768kbps 4. Traffic status of the Tokyo-Washington link 25 Mbytes/day 50% of CIR 1093 Mbytes/day 40% of CIR

  6. Melbourne Tokyo 256kbps 1.5Mbps CIR=16kbps FR CIR=32kbps 5. Traffic status of the Tokyo-Melbourne link 191 Mbytes/day 200% of CIR 135 Mbytes/day 100% of CIR

  7. Beijing Tokyo 2 Mbps 1 Mbps MPLS 6. Traffic status of the Tokyo-Beijing link 441 Mbytes/day 434 Mbytes/day

  8. MPLS 7. Traffic status of the Tokyo-New Delhi link New Delhi Tokyo 128 kbps 1 Mbps 41 Mbytes/day 3 Mbytes/day

  9. Dedicated line 8. Traffic status of the Tokyo-Khabarovsk link Khabarovsk Tokyo 64 kbps 1 Mbps 17 Mbytes/day 2 Mbytes/day

  10. FR FR CIR=16kbps CIR=16kbps 9. Traffic status of the Tokyo-Bangkok link Bangkok Tokyo 59 Mbytes/day 192kbps 128kbps 100% of CIR 2 Mbytes/day

  11. FR FR CIR=16kbps CIR=16kbps Hong Kong Tokyo 192kbps 64kbps 10. Traffic status of the Tokyo-Hong Kong link 170 Mbytes/day 100% of CIR 7 Mbytes/day

  12. FR FR CIR=16kbps CIR=16kbps Seoul Tokyo 192kbps 64kbps 11. Traffic status of the Tokyo-Seoul link 233 Mbytes/day 100% of CIR 18 Mbytes/day

  13. FR FR CIR=16kbps CIR=16kbps Manila Tokyo 192kbps 64kbps 12. Traffic status of the Tokyo-Manila link 45 Mbytes/day 100% of CIR 1 Mbytes/day

  14. UNIX Operating system CPU 1.9GHz X 4 Memory 8GB UNIX Operating system CPU 1.9GHz X 4 Memory 8GB GTS links Internet 13. GTS facilities in RTH Tokyo -Conceptual design- Message/File Switching System Back-end system • Central telecommunication facility in JMA was fully replaced in October 2005. • The new GTS switching system is composed by two UNIX servers in a cluster. Message editing Fax format conversion BUFR encode & decode Shared disk WMO monitoring cluster control NWP system Intranet systems Major functions supporting GTS operations + Message and Fax exchanges by both socket and so-called batched ftp through GTS + File exchanges by ftp through GTS + Collection of observational data by e-mail via the Internet

  15. Internet ISP #1 ISP #2 Multi-homed connections for reliability 20Mbps 20Mbps Packet Shapers JMA Intra-net Router Controllers Firewalls Load Balancer DMZ Public Servers FTP Servers 14. JMA Internet Connection • Multi-homed connections to Internet with two dedicated links since 2001 • Two 20 Mbps links in operation: one since February 2005, the other since March 2006 ISP #1 ISP #2 2008 2007

  16. Thank you

More Related