360 likes | 499 Views
c. c. 505 CONGRESS STREET. A VISION FOR SOUTH BOSTON. c. tatsuyuki ariizumi. hasan halkali. jong yoon lim. leo shieh. paul stewart. kristy wang. 505 CONGRESS STREET. A VISION FOR SOUTH BOSTON. Agenda Market Analysis Entitlements Design & Construction Financial Conclusions.
E N D
c 505 CONGRESS STREET A VISION FOR SOUTH BOSTON
c tatsuyuki ariizumi hasan halkali jong yoon lim leo shieh paul stewart kristy wang 505 CONGRESS STREET A VISION FOR SOUTH BOSTON
Agenda • Market Analysis • Entitlements • Design & Construction • Financial • Conclusions introduction
1. Introduction: - Site orientation (maps, photos) - Overall program (number units, young professionals, new neighborhood…) introduction
2. Market Analysis: • - Market overview (economy, population… briefly) • alternative uses (condo justification) • Market study (mkt area, demand supply, submkt) • marketability of our product • general program inspired in comps • Issues KW • read write up, why each data is useful, convincing • projections forward market analysis
The Boston Harbor Association Save the Harbor/Save the Bay City of Boston Office of Civil Rights The Children’s Museum Artery Business Committee Boston Shipping Association, Inc. Dorchester Heights Association Greater Boston Chamber of Commerce UMass/Boston: Urban Harbors Institute National Park Service Fort Point Cultural Coalition Fort Point Arts Community Adaptive Environments Conservation Law Foundation Boston Society of Architects Boston Natural Areas Network Boston Harbor Island Alliance Seaport Alliance for a Neighborhood Design Walk Boston Massachusetts Bicycle Coalition What we don’t want to happen… entitlements
Zoning • South Boston Waterfront IPOD (Article 27P) • General Use • FAR: 4.0 • SCR: .50 • Height: 150’ • Parking: ~ .70 - 1.5 • Proposed • Multifamily Residential • FAR: 5.95 (overall) / 4.94 (ex. parking) • SCR: .60 • Height 250’ • Parking: .70 entitlements
Development Review (Art. 80) • Multi-phase process • Site plan • Urban design • Historic resources • Infrastructure systems • Transportation • Environmental protection • Areas of potential concern • Building area limits • Construction staging • Parking… entitlements
Entitlements issues • Affordable Housing • Set aside of 14% of units • Moderate income households: 80% AMI • Public Benefits • Road work & offsite mitigation: $300K set aside • Property taxes: 40x increase from current tax revenue • Other • Strong public interest in jumpstarting development • No abutters, small parcel = less scrutiny & opposition • Schedule • Eighteen months allocated entitlements
that building looks really familiar… design & construction
north Site Orientation Direct connection to downtown Three blocks to waterfront One block to Silver Line Plaza faces Conv. Ctr & T stop Secluded garden on West side Tower looks away from vent bldg Parking as buffer to rear design & construction
Parking hidden from st. Private Entrances Secluded garden Trees for summer shade Retail facing plaza Generous storage area design & construction
Deck, outdoor barbecue Multi-use space Movie theater Gym design & construction
Signature curtainwall used sparingly Efficient precast cladding Shared rooftop garden Brick and metal panel cladding Parking abuts I-90 ramp Rooftop garden Generous glazing at duplexes Pedestrian scale on Congress St design & construction
Lower tier 8’-6” ceilings Fan coil HVAC system Laminate & tile floors Shared laundry Standard kitchens design & construction
Middle tier 8’-6” ceilings Fan coil HVAC system Hardwood & tile floors In-unit laundry Granite counters design & construction
Upper tier 10’-0” ceilings Radiant + forced air HVAC systems Hardwood & stone floors In-unit laundry European appliances design & construction
Unit mix & rents design & construction
5. Construction Budget: Hard costs $36.03M Base building including site work $200 / gsf Parking, average $20,000 / space Contingency 3% of hard cost Soft costs $6.67M Design & legal fees 8% of hard cost Development fee 2% of hard cost Leasing fee 2% of hard cost Other 6% of hard cost Contingency 5% of soft cost Construction loan interest $1.49M Land acquisition $7.00M Total development cost $283 / gsf $51.19M design & construction
jy • 6. Financial: • assumptions • holding period (property management) • property level • deal structure • investment level • sensitivity • Issues JY • bridging finance for lease-up period • holding period (better return if we keep it after stabilized) financial
jy • 7. Conclusions: • potential challenges • good opportunity for everybody • yanni, we’re buying the site conclusions
c tatsuyuki ariizumi hasan halkali jong yoon lim leo shieh paul stewart kristy wang
c 505 CONGRESS STREET A VISION FOR SOUTH BOSTON