National Overview Germany Peter Fritz

National Overview Germany Peter Fritz. EAES Combined Meeting 2011 Amsterdam, June 18 - 22, 2010. Vice President for Research and Innovation. Germany within the Top Ten. (Electricity production of Nuclear Power Plants in 2010). German nuclear power phase-out (Status 2002). 2002.

kelii
Download Presentation

National Overview Germany Peter Fritz

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National Overview GermanyPeter Fritz EAES Combined Meeting 2011 Amsterdam, June 18 - 22, 2010 Vice President for Research and Innovation

  2. Germany within the Top Ten (Electricity production of Nuclear Power Plants in 2010)

  3. German nuclear power phase-out(Status 2002) 2002

  4. German nuclear power phase-out(Status 28.09.2010) 2010

  5. German nuclear power phase-out(Status June 2011) 2011 2022 inoperative (Moratorium) inoperative (Moratorium) inoperative (Moratorium) inoperative (Moratorium) inoperative (Moratorium) inoperative (Moratorium) inoperative (Moratorium)

  6. Press Articles „on Fukushima“: until 14.04.2011 Germany43.640 All other EU member states 9.300 Source: Meltwater News • Until12.04.: • morethan 300 registered inquiriesat Helmholtz • More than150 articlesin printmedia, • More than50 TV reports, • More than80 radiointerviews, • More than270 articlesin online media.

  7. Election in the state of Baden-Württemberg Vote-% change for the parties

  8. Election in the state of Baden-Württemberg Seats for the parties

  9. Title: „Germany‘s Turnaround in Energy: A Joint Effortforthe Future“ Chairs: Klaus Töpfer & Matthias Kleiner Conclusions: The diversityandcomplexityoftheproposals, whichconcerntheprocedure, themeasuresandtheinstitutionsoftheturnaround in energy, makeclearthatthisisindeed a jointeffort (‚Gemeinschaftswerk‘). The EthicsCommissionconsidersthestepwisephase-out ofnuclearenergyas an extraordinarychallengeto all participantsand, atthe same time, as a sourceofnewopportunitiesforthecontributionofthepublic in localdecisions. The EthicsCommissionisconvincedthatthephase out ofnuclearenergycanbeachievedwithin a decade, bymeansofthereportedmeasures. This objectiveandtherequiredmeasuresshouldbetakenupbysociety in a binding form. The requireddecisionsforplanningandinvestmentscanonlybetaken on basisofdistinctandtimedgoals. The processrequires a consequent, goalorientedandpoliticallyefficientmonitoring (analysis, assessment, recommendations). Ethics-Commission: Safe Energy Supply (1/3) Final Report dated May 30 2011

  10. Title: „Germany‘s Turnaround in Energy: A Joint Effortforthe Future“ Chairs: Klaus Töpfer & Matthias Kleiner Conclusions: The phase out isrequiredandrecommended in ordertoomitfutureriskswhicharisefromnuclearenergy in Germany. This ispossibleasthereare alternatives withlessrisk potential available. Initially, thephase out meanstotakenuclear power plants off thegrid. The EthicsCommissionis well awarethatnuclear power plantsrequire intensive worksfor a long time, asfarassecurityanddecommissioningareconcerned. Final disposalofnuclearwastes must berealisedunderhighestsafetyrequirementsand in a retrievableway, asfuturegenerations must havetheoptiontoreducethedangerandvolumeofthewastes, ifrespectivetechnologiesareavailable. Ethics-Commission: Safe Energy Supply (2/3) Final Report dated May 30 2011

  11. Title: „Germany‘s Turnaround in Energy: A Joint Effortforthe Future“ Chairs: Klaus Töpfer & Matthias Kleiner Conclusions: The safetyofnuclearinstallationsandthebuildupof a futureenergysupplyaretopicsof high importancefor European and international politicsandcollaboration. The Ethics-Commissionrecommendstothe German Governmenttoundertakeapproaches, in ordertogloballyaddresssafetyaspectsofnuclearenergysupplyandto promote furtherdevelopmentandadjustmentoftheIAEA‘swork. Ethics-Commission: Safe Energy Supply (3/3) Final Report dated May 30 2011

  12. Electricity production from Photovoltaics in Germany Installed capacity PV: 2010 = 17.320 MW Average11.3.-23.3. Source: Data Bundesnetzagentur 2011

  13. Electricity production from wind in Germany Installed windpower : 2010 = 27.204 MW Average11.3.-23.3. Source: Data Bundesnetzagentur 2011

  14. Electricity production from wind and PV in Germany Installed windpower : 2010 = 27.204 MW Installed capacity PV : 2010 = 17.320 MW 44.524 MW Total Average11.3.-23.3. Source: Data Bundesnetzagentur 2011

  15. Electricity production from wind and PV in Germany Installed windpower : 2010 = 27.204 MW Installed capacityPV: 2010 = 17.320 MW 44.524 MW Source: Data Bundesnetzagentur 2011

  16. Electricity production from wind and PV in Germany Installed windpower : 2010 = 27.204 MW Installed capacity PV : 2010 = 17.320 MW 44.524 MW Average11.3.-23.3. Source: Data Bundesnetzagentur 2011

  17. Electricity production from wind and PV in Germany Installed windpower : 20XX: 54.000 MW Installed capacity PV : 20XX: 35.000 MW 20XX: 89.000 MW Average11.3.-23.3. Source: Data Bundesnetzagentur 2011

  18. Electricity Production in Germany (2008 – 2010) TWh 24% 23% 57% Fossil 23% Nuclear 16% Renewables 19% 13% 6% 5% 4% 3% 2% 1% Installed capacity 14 % 13% 18% 15% 3% 17% 11%