An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The South Broad Street Corridor Plan: Planning Commission Workshop October 17, 2007 City of San Luis Obispo

  2. Format of Meeting • Brief staff presentation to respond to several issues raised at previous hearing • Review Development Capacity analysis • Breakout sessions to further discuss 3 topic areas: Circulation, Land Use, and Form-based Codes • Reconvene to feed back information to larger group • Discuss and give direction to staff

  3. Commission Direction • Evaluate development capacity with regard to parking • Restudy land use types and transitions • Restudy street circulation and cul-de-sac street ends • Consider economic implementation tools • Clarify plan organization and how form-based codes would work • Set up special workshop to discuss alternatives

  4. Staff Response • Analyzed development capacity, parking and access for 8-block area • Re-evaluate land use types and location • Reviewed examples of FBCs and identified needed changes for SBSC • Reviewed traffic count results and preliminary existing conditions analysis • Researched and rewrote section on ‘economic tools’

  5. Analysis of Development Capacity • Estimate potential floor area and floor area ratios for an 8-block area of the South Broad Street Corridor Plan (SBSCP) • Evaluate massing model, potential land assembly and vehicle access based on development standards in the draft Plan • Provide a capacity baseline for environmental/traffic analysis • Explore how parking requirements affect achievable floor area ratios (FAR).

  6. Methodology • Defined area of study: focus on center of planning area with oldest development • Described assumptions • Designed a typical block lot layout • Sited buildings and access ways • Applied development standards from draft SBSCP • Land use, FAR, height limits, setbacks, parking requirements. • Provided mixed building types and uses • Allow for cross-block access via alleys and pedestrian paths

  7. Assumptions • Balance parking demand and supply on each block • Reciprocal parking and access easements on each block • Each block has a mix of commercial and residential uses following the draft plan. • Preserve most potentially historic buildings and rehabilitate for commercial uses • Assume 24 ft. wide cross-block access ways • 100 ft. setback for dwellings and 3-story buildings from Broad St. • Graphics reflect capacity estimates and show potential building height, placement, and massing; they do not reflect architectural styles from the draft plan.

  8. Parking • Develop two parking scenarios for each block: • at grade level, covered • at grade plus below grade • 30% mixed-use parking reduction applied to each block • Guest parking provided on street • Parking requirements based on the following ratios: • Commercial / Office: 1 per 300 sq. ft. • Service Commercial (C-S): 1 per 500 sq. ft. • Residential: 1 per studio; 1.5 for first bedroom plus 0.5 spaces for each additional bedroom unit.

  9. Combined Summary Findings * On site parking vehicles only

  10. Summary Findings Estimated number and types of Dwelling Units:

  11. Numbered Block Index Study Area 18 19 20 17 12 13 14 15

  12. Demonstration Block 12A 12 Scenario A: At grade level parking Existing Property Lines Potential Building Area • Commercial / Office, Mixed-use, Live / Work, Retail • Height: 25 ft ● 162 Parking Spaces • Average FAR: 0.93 ● (30) 2 BR Buildings Preserved; Potential Historic Value

  13. Demonstration Block 12B 12 Scenario B: At grade plus below grade level parking Existing Property Lines Potential Building Area Below grade level parking • Commercial / Office, Mixed-use, Live / Work, Retail • Height: 35 ft ● 209 Parking Spaces • Average FAR: 1.10 ● (30) 2 BR and (13) Studios Buildings Preserved; Potential Historic Value

  14. Form-Based Code Discussion • Primary focus on form of streetscape as defined by buildings. Emphasis on building type, dimensions, facades, and parking locations. • Two different formats: transect vs districts, neighborhoods, and corridors – Broad Street Corridor uses the latter • Public participation

  15. Transect-based Model

  16. District, Neighborhood, & Corridor Form-based Code

  17. Form-Based Codes cont. • Regulating Plan Options - examplesFarmers Branch Texas City of Santa AnaCity of HerculesSalinas • Organization of Plan • Streets and Building types • Funky Character

  18. Salinas - existing

  19. Salinas – proposed

  20. Land Use Discussion Key Land Use Issues: • Are the proposed land use classifications and general locations appropriate (e.g. “Mixed-Use Neighborhood Commercial)? • What land uses not addressed in Draft Plan should be allowed? • Should new dwellings be allowed adjacent to Broad Street? • Should flexible parking requirements be applied, such as on-street guest parking? • What type of housing is appropriate off Orcutt?

  21. Conceptual Land Use Plan

  22. Circulation Discussion Key Circulation Issues: • Should cul-de-sacs be provided at Broad Street? • Should an internal grid network of public or private streets be provided? • How should Bicycle Advisory Committee comments be included? • Identify key pedestrian, bicycle, public transit links and points of connection.

  23. Master Plan Illustrative

  24. Breakout Session City of San Luis Obispo