140 likes | 279 Views
DRAFT. Consumer Green Button Storyboard. Smart Meter Texas Release 4.0 Requirements January 27, 2012. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Consumer Green Button Storyboard. Consumer navigates to SMT home page and clicks on Green Button
E N D
DRAFT Consumer Green Button Storyboard Smart Meter Texas Release 4.0 Requirements January 27, 2012
1 2 3 4 5 6 7 8 9 10 Consumer Green Button Storyboard Consumer navigates to SMT home page and clicks on Green Button Consumer lands on preauthenticated Green Button overview page to learn about the initiative and capability If needed, the consumer registers, or existing users log in to SMT Consumer lands on the authenticated home page where there is a Green Button link in the body and left navigation If the consumer clicks on the Usage tab, she sees a Green Button link on the Left Navigation and a green ‘Export Report(s)’ button Consumer is taken to Export Report(s) editor page, a.k.a. the ‘Green Button’ page Consumer selects meter(s), Report type, edits date range, selects Report Format and clicks ‘Export Report(s)’ to initiate the usage report The report request is added to ad hoc report queue and a confirmation screen is displayed to the user The ad hoc report request is logged into the Request Report Status portlet After SMT has run the report, the Consumer receives an email with the report attached
5a 5b 10 9 1 2 3 4 6 7 8 Consumer Green Button Storyboard Authenticated Experience Consumer has multiple meters Registration Existing process unchanged Preauthenticated Experience Login Usage landing page Existing process unchanged Authenticated landing page Export Reports page Consumer has 1 meter Home page Green Button page Registered? No Consumer’s confirmation e-mail Ad hoc report confirmation page Report request status page Yes
1 Consumer navigates to SMT home page and clicks on Green Button Existing preauthenticated home page Preauthenticated home page content could be updated to include Green Button promotional content above the fold (not shown here) New left navigation for ‘Green Button’ on the home page Green Button
2 Consumer lands on preauthenticated Green Button overview page to learn about the initiative and capability About Green Button New preauthenticated public page for consumers to promote the ‘Green Button’ initiative Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no ea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et Green Button
3 If needed, the consumer registers, or existing users log in to SMT OR Existing registration and login capabilities
4 Consumer lands on the authenticated home page where there is a Green Button link in the body and left navigation Existing authenticated landing page Left navigation and authenticated landing page Green Button link take the user directly to the Usage / Export Reports editor page a.k.a the Green Button page New left navigation item for ‘Green Button’ makes it very visible and accessible from multiple locations in the authenticated experience Green Button New Get Started… item added to the authenticated landing page for added visibility to the initiative.
5a If the consumer with multiple meters clicks on the Usage tab, she sees a Green Button link on the Left Navigation and a green ‘Export Report(s)’ button Existing Usage / My Smart Meters page If the user misses the ‘Green Button’ navigation and heads into the Usage area, she will be able to access the Green Button from Usage as well. Green Button Export Report(s)
5b If the consumer with 1 meter clicks on the Usage tab, she is directed to the Usage Report page. Consumer also sees the Green Button in the left nav. Consumer with only 1 meter clicks on Usage and is directly taken to the Usage Reports page Existing Usage / My Smart Meters page Green Button If consumer clicks on Green Button, consumer is taken to the Green Button page Consumer is prompted to download their data in csv format if the date range specified is: Consumer is taken to the Green Button page to download data in CSV or XML format if the date range specified is: • 1 day or less for 15 minute interval data • 30 days or less for daily data • 24 months or less for monthly data • Greater than 1 day for 15 minute interval data • Greater than 30 days for daily data • Greater than 24 months for monthly data Export
6 Consumer with more than 1 meter clicks on Export Report(s) and consumer with 1 meter clicks on Green Button link or selects a date range beyond that for instant data download, consumer is taken to Export Report(s) editor page, a.k.a. the ‘Green Button’ page Updated page help and new About text to provide an overview of the Green button program The existing Export Report(s) editor will become the Green Button page. It will allow the user to export up to 13 months of interval usage in an XML format. Green Button About Green Button Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd New ability to choose meter(s) on the page, in case the user skipped past the Usage/My Smart Meters page. Consumers with 1 meter do not need to select a meter since it is selected by default New ability to choose Report format, either CSV or XML. Export Report(s) in CSV Export Report(s) in XML
7 Consumer selects meter(s), Report type, edits date range, selects Report Format and clicks ‘Export Report(s)’ to initiate the usage report Green Button About Green Button Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd Hold the current 1 day date range default, but continues to allow the user to specify up to 13 months of interval data Add an XML option to meet the Green Button requirements, but default to CSV as a choice, which is more consumer friendly and yields smaller file sizes Report Format CSV XML Export Report(s) IBM Confidential
8 The report request is added to ad hoc report queue and a confirmation screen is displayed to the user Green Button Existing Export Report(s) confirmation page
9 The ad hoc report request is logged into the Request Report Status portlet Existing Usage / Report Request Status page Green Button
10 After SMT has run the report, the Consumer receives an email with the report attached Existing SMT Data Request Complete email