NATURAL GAS TRANSPORTATION COMMITMENTS

NATURAL GAS TRANSPORTATION COMMITMENTS. September 20-21, 2007 (Houston) September 27-28, 2007 (Dallas) November 1-2, 2007 (Austin) James E. Goddard Locke Liddell & Sapp PLLC 600 Travis Street, Suite 3400 Houston, Texas 77002-3095 713.226.1184 jgoddard@lockeliddell.com.

kimbrough
Download Presentation

NATURAL GAS TRANSPORTATION COMMITMENTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATURAL GAS TRANSPORTATION COMMITMENTS September 20-21, 2007 (Houston) September 27-28, 2007 (Dallas) November 1-2, 2007 (Austin) James E. Goddard Locke Liddell & Sapp PLLC 600 Travis Street, Suite 3400 Houston, Texas 77002-3095 713.226.1184 jgoddard@lockeliddell.com

  2. Available Options for Transportation • Gathering Systems • Usually connected to multiple wells • Operate at low pressures (typically less than 300 psi) • Generally do not transport over long distances • Usually deliver gas to processing plants Source: www.texasenvironmentalenergygroup.com

  3. Available Options for Transportation • Transmission Pipelines • Larger diameter and higher pressures • Typically transport longer distances • Interstate or intrastate pipelines Source: www.vnf.com

  4. Available Options for Transportation • Alternatives to pipeline transportation • U.S – Compressed gas truck transportation • Asia - LNG truck transportation Source: www.tuckergas.com Source: www.awpe.co.jp Source: www.aceconservator.com

  5. Available Options for Transportation • Alternatives to pipeline transportation (cont.) Source: news.nationalgeographic.com

  6. Types of Transportation Service • Interstate Pipelines • There are over 213,000 miles of interstate pipelines in the lower 48 states (enough to circle the globe 8 times) • As of September 13, 2007, there were 205 interstate pipelines registered with FERC • Over 40 trillion cubic feet of gas was transported through interstate pipelines in 2005

  7. Interstate Pipelines Source: www.eia.doe.gov

  8. Types of Transportation Service • Texas Intrastate Pipelines • Texas has more intrastate pipeline miles (over 43,000 miles) than any other state • As of the end of 2005, there were 102 intrastate pipelines in Texas • During 2005, more than 9.2 trillion cubic feet of gas was transported on Texas intrastate pipelines

  9. Texas Intrastate Pipelines Source: www.eia.doe.gov

  10. Locating Nearby Pipelines • Pipeline Markers Source: www.epplp.com Source: www.pngts.com

  11. Locating Nearby Pipelines • Railroad Commission GIS Map Viewer (http://gis2.rrc.state.tx.us/public/)

  12. RRC GIS Map Viewer

  13. RRC GIS Map Viewer

  14. RRC GIS Map Viewer • Right-click on the “Map Tools” box for a drop-down menu • Select “Identify Pipelines” in the drop-down menu • Place cursor over a pipeline and right-click

  15. RRC GIS Map Viewer

  16. Types of Transportation Service • Firm Service • High Priority of Service – No Interruptions unless: • Force Majeure • Other Contractually-Agreed Reasons • Required by Governmental Regulations • Fees • Reservation Fee for Capacity Reservation • Volumetric Fee • Interstate Capacity May be Released

  17. Types of Transportation Service • Interruptible Service • Lowest Priority of Service, with No Guarantee of Delivery • No Reservation Fees on Interstate Pipelines or Intrastate Pipelines Transporting Pursuant to Section 311 of the Natural Gas Act • Interruptible Shippers Generally Have Back-Up Gas Sources

  18. Types of Transportation Service • No-Notice Service • Highest Premium Service • Firm Service on Steroids • Gas Deliveries Made on Demand, up to the Contractual Maximums • Combination of Firm Service and Storage Service • Shippers are Generally Local Distribution Companies

  19. Types of Transportation Service • Park and Loan Service • Essentially Short-Term Storage Service • Parking = Short-Term Loan of Gas to the Pipeline • Loan = Short-Term Loan of Gasfromthe Pipeline • Often Used to Mitigate Imbalances on the Pipeline

  20. Transportation Agreements • Interstate Pipelines • Terms and Conditions of Service Governed by Tariff • Tariffs Thoroughly Analyzed by FERC Prior to Commencement of Service • Interested Parties Can Protest Specific Provisions prior to Acceptance by FERC • Terms and Conditions Generally Non-Negotiable

  21. Transportation Agreements • Texas Intrastate Pipelines • Agreements Independently Negotiated • RRC Does Not Approve General Terms and Conditions • RRC Tariffs Include Very Limited Information • Company Name • RRC Company ID • Tariff Code • RRC Tariff No. • Status • Customer Name • Initial Service Date • Contract Date • Inactive Date • Received Date • Amendment Date • Term of Contract Date • Contract Comment • Service Description • New? • RRC Docket No. • Amendment (Explain) • Other (Explain)

  22. Can Pipelines Discriminate Against Shippers? • FERC Order No. 497 • Pipelines Must Treat All Shippers on a Non-Discriminatory Basis • Pipelines May Not Give Preferential Treatment to Affiliates

  23. Can Pipelines Discriminate Against Shippers? • To Implement Non-Discrimination Policies, FERC Requires Pipelines to: • Strictly Enforce Tariff Provisions that Do Not Permit the Use of Discretion • Apply Uniformly All Tariff Provisions that Permit the Use of Discretion • Log Detailing Exercise of Discretion Is Required • Log Must Be Posted on the Pipeline’s Website • Process All Similar Requests for Service in the Same Manner • Not Give Preference on Price or Services to Marketing or Energy Affiliates

  24. Can Pipelines Discriminate Against Shippers? • RRC Standards of Conduct • Require Intrastate Pipelines to: • Treat Similarly-Situated Shippers the Same • Not Give Preference over Similarly-Situated Shippers • Process Requests for Transportation from all Similarly-Situated Shippers in the Same Manner • Maintain Separate Entries in Its Books and Records for Transportation Services Provided to Affiliates

  25. Can Pipelines Discriminate Against Shippers? • What Are “Similarly-Situated” Shippers? • RRC’s Laundry-List: • Service Requirements • Facility Locations • Receipt and Delivery Points • Length of Haul • Quality of Service • Quantity • Swing Requirements • Creditworthiness • Gas Quality • Pressures • Service Duration • Connection Issues • Other Conditions at the Time of Agreement or Negotiation

  26. Can Pipelines Discriminate Against Shippers? • RRC Curtailment Rules • Typically Apply to Sales Transactions • Also Apply to Transportation • Default Priorities (In Descending Order) • Human-Use Needs Customers • Small Industrial Customers, Commercial Customers, and Plant Protection Volumes • Large Industrial Customers with No Alternate Fuel Capability • Large Users of Gas with Alternate Fuel Capability • Interruptible Sales

  27. Can Pipelines Discriminate Against Shippers? • Curtailment Priorities of Interstate Pipelines • Established in Individual Tariffs • Examples: • First-Come/First-Served • Pro-Rata Curtailment • Highest Rate Curtailed Last • Highest Net-Present Value to Pipeline Curtailed Last

  28. When Can a Pipeline Refuse To Transport? • Force Majeure • Force Majeure Events Will Excuse a Pipeline’s Transportation Obligations • Under Texas Law: • Force Majeure Events Must Be Specified in the Contract • Impossibility Is Not Required • No Duty To Mitigate, unless Expressly Stated Source: www.fnnc.org

  29. When Can a Pipeline Refuse To Transport? • Contractual Default by Shipper • Failure to Deliver Gas • If Gas Is Not Delivered to the Pipeline, the Pipeline Will Have No Obligation To Transport • Not Just Belts and Suspenders • Protects the Pipeline From Gaming

  30. When Can a Pipeline Refuse To Transport? • Contractual Default by Shipper • Delivery of Non-Conforming Gas • Pipelines Are Not Required To Transport Gas that Does Not Meet Quality Specifications • Protects Integrity of the Pipeline System • Assures Uniformity of Quality of Gas Delivered from Pipelines • Pipelines May Waive Quality Specifications (but Waivers Must Comply with Pipeline Standards of Conduct)

  31. When Can a Pipeline Refuse To Transport? • Contractual Default by Shipper • Bankruptcy • If a Shipper Files for Bankruptcy, or otherwise Becomes Insolvent, Many Times a Pipeline’s Obligation to Transport Will be Extinguished • Subject to Applicable Bankruptcy Laws

  32. When Can a Pipeline Refuse To Transport? • Contractual Default by Shipper • Failure to Meet Credit Requirements • Of Particular Importance after Enron • If the Shipper Cannot Meet Credit Requirements, Adequate Assurance of Performance May Be Required • Pre-Payment (FERC generally will allow a maximum prepayment of reservation fees for three months) • Letter of Credit • Parent Guarantee

  33. Confidentiality Provisions • On or after September 1, 2007, no confidentiality provisions can be required in sales, transportation, or gathering contracts with producers. • Any such confidentiality provisions are unenforceable. Texas Natural Resources Code Section 81.060.

  34. Conclusion • A Firm Transportation Agreement Does Not Guarantee Deliveries of Gas under All Circumstances • Thoroughly Read the Agreement and Any Tariff Provisions that Apply Source: www.energyseer.com