1 / 12

Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois

Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois. CTA Service Area. Illinois. RTA Service Area 8 million people. CTA Service Area 3.8 million people 1.6 million CTA rides per weekday. CTA Service Standards.

korbin
Download Presentation

Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois

  2. CTA Service Area Illinois RTA Service Area 8 million people CTA Service Area 3.8 million people 1.6 million CTA rides per weekday

  3. CTA Service Standards • CTA’s service planning process is driven by the Service Standards as adopted by the Chicago Transit Board (www.transitchicago.com). • These standards describe five key measures that influence fixed-route service design: • geographic coverage, • hours of service, • frequency of service, • passenger flow, and • productivity. • The standards guide the process for public input on proposed service changes. Applying the Service Standards is an ongoing process that allows for continual improvement of the system given available funding resources. Adopted: 1990 Updated: 2001

  4. Far North (2003) Northwest North Lakeshore (2003) West Side (2006) CentralArea Southwest South Lakeshore (2003) Far South Sub-Regional Service Planning Studies • Services within a defined geographic area are evaluated in a comprehensive manner. • Changes on one route may allow for improvements on adjacent or connecting services, which may then trigger further refinements. • The result of this process is a coordinated, systematic change in bus and rail service resulting in improved service for customers.

  5. Sub-Regional Study Process • Collect and analyze data for study • Background Data • Community Workshops • On-board Surveys • Develop draft plan and present to public • Seek Board approval to implement 180 day experiment • Monitor, Evaluate, Modify • Public Hearing • Board approval for adoption

  6. New Starts Alternatives Analysis Studies • An Alternatives Analysis (AA) study is the first planning step in the Federal Transit Administration’s (FTA) process for obtaining “New Starts” grant funding for major transit facility design and construction. • CTA has previously obtained New Starts grant funding to support the Cermak Branch (Pink and Blue Lines) reconstruction and the Brown Line capacity expansion project. • CTA has initiated AA studies for each of the transit system expansion projects that were authorized for federal funding as part of the current federal transportation bill, known as SAFETEA-LU.

  7. Select Locally Preferred Alternative Alternatives Analysis Study Preliminary Engineering /Environmental ImpactStatement FTA Approval to Enter PE FTA Approval to Enter Final Design FTA Full Funding Agreement Final Design Construction Overview of CTA New Starts Projects Current CTA New Start Project Status Red Line Extension to 130th Orange Line Extension to Ford City Yellow Line Extension to Old Orchard Circle Line Brown Line Capacity Expansion FTA Approval 1999; P.E/E.I.S. 1999-2002; Final Design 2002-2005; FFGA 2004; Construction 2005-2009 Pink/Blue Line Cermak Branch Rehabilitation (completed in 2005) FTA Approval 1999; P.E/E.I.S. 1999-2000; Final Design 2000-2001; FFGA 2001; Construction 2001-2005 Typically a 10-15 year process

  8. Yellow Line Extension Circle Line Orange Line Extension Red Line Extension Overview of CTA Alternatives Analysis Studies • Consultant contracts have been awarded and Alternatives Analysis studies are currently underway for: • Red Line Extension • Orange Line Extension • Yellow Line Extension • Circle Line

  9. The Alternatives Analysis Study Process • Requirement for federal funding for transit expansion (FTA New Starts Grant Program) • Identifies transit opportunities and ensures all practical solutions are considered • Ensures planning is consistent among all New Starts projects throughout the U.S. • Opportunity to provide information and receive public input • Goal is to identify the Locally Preferred Alternative (LPA)

  10. Evaluation Criteria Screen 1 Public Input Screen 3 Public Input Screen 2 Public Input LPA Alternatives Considered Alternatives Analysis Process (approx. 2 years) The Alternatives Analysis Evaluation Process • Progressively fewer alternatives are studied with additional evaluation criteria until a Locally Preferred Alternative (LPA) is identified.

  11. 95th Street (9500S) Western Ave. (2400W) 2000 E 13800 S Red Line Extension to 130th Street Overview • Proposed Study Area & Possible Alignment The map shown above is for illustrative purposes only and does not necessarily represent the outcome of the FTA Alternatives Analysis process.

  12. Red Line Extension to 130th Street Overview • Extension approximately 6 miles long • Study Area includes Roseland and West Pullman Neighborhoods • Study Area also directly intercepts many bus routes(13 CTA & 6 Pace Routes) • Alternatives Analysis currently underway