280 likes | 487 Views
Jacobs Design Innovation Institute (JDII). JDII Background. CoE Advisory Board Document (April 2013): “this is an ideal time to extend and grow the role of design in our educational model at all levels: undergraduate, graduate and continuing education”. JDII Genesis.
E N D
JDII Background CoE Advisory Board Document (April 2013): “this is an ideal time to extend and grow the role of design in our educational model at all levels: undergraduate, graduate and continuing education”
JDII Genesis $20 million pledged by Paul and Stacy Jacobs in May 2013. • Berkeley Alums, long-time supporters of CoEand the campus. • Goal is a 24,000 sqft, 3.5-story building North of Soda Hall. “In our interconnected innovation economy, it is not enough to provide our future engineering leaders with technical skills,… They must also learn how to work in interdisciplinary teams, how to iterate designs rapidly, how to manufacture sustainably, how to combine art and engineering, and how to address global markets.” - Paul Jacobs, Clinton Global Initiative 2013.
JDII Background Themes: • Real-world problems and needs • Innovation through building • Rapid prototyping • Interdisciplinarity • Design for sustainable manufacturing • Global markets
JDII Background Synergies: • CITRIS Invention Lab • Mech. Eng. Workshop(under JDII) • Cal Design Lab • BID Lab • Capstone design courses in CoE • BCNM, VCL, I-School, Architecture,… • Maker Movement • MOOCs, Flipped Classrooms, Studio Model, Modular Curriculum
JDII Priorities Undergraduate Instruction: • Concentration in Design for Engineering Majors • Requirements TBD, a curriculum committee is working on this (3 elective courses w/ core course)? • Minor in Design for non-Engineering Majors • 5 courses, only one sharable with the Major Goal of around 2000 student-courses per semester. Hands-on, studio courses. Small groups around a workbench. The Studio/Classroom: Projectors + Critique space + Lots of vertical work surfaces
JDII Priorities Masters Degrees ? Courses for Professionals ? Research Space ? TBD: Focus on undergrad education for now.
JDII Structure • Director position announced, 1FTE allocated. Search includes both campus and external candidates. • Staff: • Lab/safety officer • Academic program administrator • Finance, Special Projects ?? - still TBD
JACOBS HALL: Project Milestones(from Scott Shackleton) Design Task Force (Building & Program) Commenced – May 2013 Schematic Design – Completed Sept 10, 2013 Design Task Force Building Committee Complete – Sept 30, 2013 Design Development – Completed Nov 2013 Construction Design – Completed Feb 2014 Construction starts – Mar/Apr 2014 Construction completed – July 2015 First Classes held in Fall 2015
JDII cross section from W Woz F4 Soda Hall F3 Etcheverry F2 Etcheverry F1
JDII Level 4 Floor Plan Wozniak Terrace
JDII Level 3 Floor Plan Soda Hall
JDII Level 2 Floor Plan Etcheverry Hall
JDII Level 2 Floor Plan (alt.) Etcheverry Hall