An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. X-Ray Calorimeter Mission Flight Mirror Assembly Thermal Analysis Mike Choi 2-6 April, 2012

  2. Flight Mirror Assembly (FMA) Thermal Requirement • Mirror temperature requirement: 20˚C±0.5˚C

  3. Flight Mirror Assembly (FMA) Thermal Requirement • Mirror segments view space at one end and metering structure at other end

  4. Thermal Model Parts Identification Mirror Module Non-Conductive Pre-Collimator: 13.6 cm Tall Mirrors

  5. Worst Cold Case Temperature Predictions without Heaters on Metering Structure: BOL and -45˚ Pitch ˚C S/C Exterior (Sunside) ˚C Mirror Segments Sunside Anti-sunside ˚C No Heaters On Metering Structure. Heaters On Conductive Portion of Pre-Collimator and Module Walls. Poor Temperature Gradient. NOTE: Baseline pitch is ± 25 ºC Metering Structure

  6. Worst Cold Case Temperature Predictions without Heaters on Metering Structure: BOL and -25˚ Pitch S/C Exterior (Sunside) ˚C Mirror Segments ˚C Sunside Anti-sunside ˚C No Heaters On Metering Structure. Heaters On Conductive Portion of Pre-Collimator and Module Walls. Poor Temperature Gradient. NOTE: Baseline pitch is ± 25 ºC Metering Structure

  7. Metering Structure Temperature Control • Without active heater control on metering structure, mirror temperature gradient exceeds thermal requirement significantly • Active heater control on metering structure is required • First 1.5 m of metering structure is actively controlled to 22.8˚C ±0.25˚C • Heaters and thermistors are attached to exterior of metering structure

  8. Worst Cold Case Temperature Predictions with Heaters on Metering Structure: BOL and -45˚ Pitch ˚C S/C Exterior (Sunside) Mirror Segments ˚C Sunside Anti-sunside ˚C Heaters On Metering Structure. Heaters On Conductive Portion of Pre-Collimator and Module Walls. Heater Power : 647 W peak (453 W average) for 24 Mirror Modules. Metering Structure

  9. Worst Cold Case Temperature Predictions with Heaters on Metering Structure: BOL and -25˚ Pitch ˚C Mirror Segments ˚C S/C Exterior (Sunside) Sunside ˚C Anti-sunside Heaters On Metering Structure. Heaters On Conductive Portion of Pre-Collimator and Module Walls. Heater Power : 637 W peak (446 W average) for 24 Mirror Modules. Metering Structure

  10. Heater Power Summary *Average is peak multiplied by 70% duty cycle per GOLD Rules. **Heater resistance is sized based on Vmin2/R=647. ***319 W at -25˚ pitch or 326 W at -45˚ pitch for metering structure (~70% of total FMA heater power).

  11. Conclusions and Recommendations • Active heater control for first 1.5 m of metering structure is required • FMA heater power requirement in worst cold case for -25˚ pitch is 446 W average (i.e., 637 W at 70% duty cycle) • Changing pitch angle from -45˚ to -25˚ reduces average heater power by only 7 W • Approximately 70% of FMA heater power is for metering structure • More iterations on heater controller set points will be required to achieve close to optimum mirror temperature gradient