1 / 14

Addressing the Flood Risk Challenge

Addressing the Flood Risk Challenge. Work in collaborative partnership with other agencies and stakeholders to develop an integrated national flood risk management strategy Minimize risks to public safety from flood hazards

Download Presentation

Addressing the Flood Risk Challenge

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Addressing the Flood Risk Challenge

  2. Work in collaborative partnership with other agencies and stakeholders to develop an integrated national flood risk management strategy Minimize risks to public safety from flood hazards Provide flood damage reduction systems that are safe, reliable and managed in a partnership of shared responsibility Objective

  3. FEMA area of concern USACE primary focus Levee = Common Interest River Levee Floodplain NAFSMA / ASFPM area of concern Key Participants • USACE • FEMA • National Association of Flood and Storm water Management Agencies (NAFSMA) • Association of State Floodplain Managers (ASFPM)

  4. The Challenges • Out-of-date floodplain information • Aging infrastructure • Lack of understanding of the national flood risk • Uncoordinated Federal flood risk programs • Diminished capabilities in Flood Risk Management

  5. National Flood Risk Management Initiative Program Leaders

  6. Out-of-Date Floodplain Information • Interim Strategy • Expand partnership and dialogue with FEMA on Map Modernization • Actions Initiated • Corps Map Modernization PDT • Collection of available information on Corps Federal levees/floodwalls and shared information with FEMA • Levee Certification Technical team • Long-Term • More closely align FEMA’s NFIP program with Corps FDR and Inspection programs

  7. Aging Infrastructure • Interim Strategy • In partnership with FEMA, state and local partners develop a comprehensive inventory and database of flood damage reduction structures, assess the condition of those structures, and participate in performing NFIP certification of structures when appropriate. • Actions Initiated • Developed a GIS spatial database that can be used for both FEMA and USACE purposes • Develop a risk based assessment methodology for levees and perform prototype assessments • Initiate “I” wall evaluations using IPET results • Long-Term • FEMA/Corps Report on Levee/Floodwall Risks • Identification of National Infrastructure Needs for Decision-Makers

  8. FEMA NFIP Objective: Communicate the most current information for flood insurance purposes, irrespective of risk. NFIP & CORPS NFIP only Federal O&M 69 USACE built / Local O&M 800 Local built / Enrolled in RIP 593 Level of Protection 100-year Local No nexus with NFIP or Corps CORPS only Levee Categories 4 1 2 3 USACE Inventory and Assessment Objective: Risk assessment on all levees in federal programs, regardless of design level of protection. Area represents all levees throughout the US.

  9. floodwall_line levee_flood_fight_point closure_structure_line levee_failure_point levee_crossing_point pump_station_point levee_centerline sand_boil_point piezometer_point rehabilitation_line cross_section_line borehole_point protected_area levee_station_point levee_relief_well_piont gravity_drain_line encroachment_point Levee Data Model Geographic Features

  10. Federal Flood Damage Reduction Programs are Uncoordinated • Interim Strategy • Continue and expand partnership and dialogue with FEMA, other Federal Agencies and NGOs to integrate Flood Damage Reduction Programs • Short Term Action Plan • Established the Flood Risk Management Initiative, and the Interagency Flood Risk Management Committee • Maintain and expand Silver Jacket Initiative for coordination within States. • Corps levee certification guidance collaborated with FEMA • Participate in FEMA’s Interagency Levee Policy Committee • Long Term • FEMA-Corps Team to develop proposals on modifying federal policy to maximize return on federal funds used for FDR • Fully integrated Federal programs that contribute to flood risk management

  11. Improving Corps Capabilities • Interim Strategy • Increase emphasis on Corps technical competency in areas of risk assessments, project reliability and inspections • Short Term Action Plan • Establish ICW PDT to develop and implement improvement plan for inspection programs, and linking ICW efforts to the Corps Inventory and Assessment Program and FEMA’s NFIP • Development of a Risk Assessment Methodology for levees • Long Term • PDT’s to • Develop recommendations for improving risk capabilities and building awareness of risk management techniques • Improve flood risk technical policy, criteria, evaluation processes

  12. National Vision (Conceptual) • The United States Flood Damage Reduction Systems Will Be: • Safe and Reliable • Managed in a Partnership of Shared Responsibilities • Assessed in a Comprehensive and Continuing Program • Effectively Communicated to All Stakeholders, Decision Makers, and Communities West Columbus, Ohio

  13. Questions ?

More Related