HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL

HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL. Peter Wanderer BNL Archamps Workshop, March 2003. OUTLINE. New facility at GSI  work with BNL to modify RHIC dipoles  1 st magnet test Magnet construction (except superconductor) - Wanderer Quench performance - Wanderer

latika
Download Presentation

HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003

  2. OUTLINE • New facility at GSI  work with BNL to modify RHIC dipoles  1st magnet test • Magnet construction (except superconductor) - Wanderer • Quench performance - Wanderer • Superconductor R&D – Ghosh • Energy loss measurements - Ghosh P. Wanderer

  3. GSI NEW FACILITY • Use existing machines, add new accelerators, storage ring. • Serve several areas of science • General approval by German Government • Construction: Phased approach • Superconducting magnets for the highest energy accelerator (SIS200) • Last phase of construction P. Wanderer

  4. (DIPOLES FOR SIS100) • SIS100 may use superconducting magnets too (not discussed further here) • PROPOSAL (November 2001) • Superferric, 2T central field, 4 T/sec ramp • Start with Nuclotron design • PRESENT • Consider resistive dipoles (see L. Bottura) P. Wanderer

  5. DIPOLES FOR SIS200 • PROPOSAL (November 2001) • 4T central field, 1 T/sec ramp, 5 kW (4.5K) • Modify RHIC design, especially cable • GSI + BNL R&D agreement • PRESENT (SIS300) • Physics: 6T, not 4T  2 layer coil • Looking at UNK magnets P. Wanderer

  6. BNL + GSI collaboration • GSI: G. Moritz, J. Kaugerts • BNL: M. Anerella, A. Ghosh, R. Soika, P. Wanderer • Consultants: M. Wilson, W. Hassenzahl P. Wanderer

  7. Coil wedges: G11, not copper Coil oversize by ~ 25m/turn  reduce pole shim by .88 mm & modify ends Collars: assemble 15cm-long packs with G10 tubes instead of brass tubes Collars: G11 keys (except for 2 cm) Magnet (1m): coil & collars P. Wanderer

  8. Magnet: laminations • GSI procurement • BNL drawing • 0.5 mm thick • Si steel • Coated both sides with B-stage epoxy • Glued into 25.4 cm-long blocks (10 blocks) P. Wanderer

  9. Magnet: yoke, shell, splice • Yoke – axial support from ss rods inside G10 sleeves; SS nuts and G10 washers at the ends • Yoke top-bottom alignment: G10 keys • Shell: weld backing strip loose • Ramp & Splice between top & bottom coils – no change from RHIC/LHC P. Wanderer

  10. P. Wanderer

  11. Quench studies • Quench - standard ramp rate (.05 T/s) • Quench until greatly exceed 4T (6.7kA) • Quench at 1-2 T/sec • 5 kA power supply heavily modified • fast ramping • down ramp is mirror of up ramp • Reach 7.5 kA by ramping fast and minimizing time at Imax P. Wanderer

  12. P. Wanderer

  13. CONCLUSION & PLANS • Conclusion: magnet greatly exceeds design field & ramp rate .. a success • Plans: • Measure field quality  new measuring system … later this year • Test magnet w. unvented cable • Further cable improvements • Test magnet in forced flow (supercritical) P. Wanderer