1 / 7

Network/Technology Infrastructure Plan Section 8 – 9 – 10

Network/Technology Infrastructure Plan Section 8 – 9 – 10. As prepared for the TUSD Governing Board Summer 2007. John Bratcher Network Security Systems Analyst. Today’s Topics. Section 8 – Cost Estimate for Infrastructure upgrades Section 9 – Potential Funding Sources

leanna
Download Presentation

Network/Technology Infrastructure Plan Section 8 – 9 – 10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Network/Technology Infrastructure PlanSection 8 – 9 – 10 As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst

  2. Today’s Topics • Section 8 – Cost Estimate for Infrastructure upgrades • Section 9 – Potential Funding Sources • Sections 10 – Sketch of Implementation Plan

  3. Cost Estimate – WAN (QMOE)** ** not part of GB presentation

  4. Cost Estimate – WAN (QMOE)** ** not part of GB presentation

  5. Potential Sources of Funding • Bond • e-Rate • Capital • Life Cycle Budgets • Other

  6. Sketch of Implementation Plan • Implementation based on hub groups • 5 hubs with 20-36 schools per hub • Develop a metric for prioritizing individual schools within hub grouping • Age of current equipment • Individual site technology plans • Planned Bond projects • Building renewal projects • District initiatives • Leadership/staff commitment to technology integration and professional development • Network functionality • E-Rate Discount rate • 2/5 rule • Outside funding • Timelines • Approximately 5 years • Incremental increase of bandwidth to schools as equipment modernization supports

  7. Questions