An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MCIEAST /MCB Camp LejeuneFacilities (GF) CAPT Jason Faunce, USN AC/S, G-F

  2. MILCON Funding HistoryUSMC and MCIEAST Millions of Dollars USMC MILCON Average Pre-2007~ $250M Fiscal Year

  3. MCIEAST FY14 Military Construction

  4. MCIEAST FY15 Military Construction

  5. Facilities Sustainment, Restoration and Modernization (FSRM) • FSRM allocations • 60% of total requirement is local FSRM allocated to installations for day-to-day maintenance, repairs and minor construction. • 40% of total requirement is Centrally Managed Program (M2/R2) funds Special Projects • Facilities Sustainment • HQMC historically funded 90% of sustainment requirement • HQMC funded less than 80% of sustainment at start of in FY14 • HQMC restored funding to 90% during the year • HQMC also cut and restored Restoration & Modernization funding • Intense focus on execution this year 5

  6. Installations Energy Lines of Operation Mission • Ensure a secure and reliable energy supply • Achieve requirements mandated by Congress and the President • Reduce the lifecycle operating costs of Marine Corps facilities and manage future commodity price volatility. Energy Information Energy Efficiency Renewable Energy and Alternative Fuel Energy Security Developing and implementing tools to better measure our consumption Leveraging efficient design & technologies into our buildings and vehicles Sourcing more energy from renewable and alternative resources Identifying and mitigating mission risks from energy supply disruption Key Component to Support Ethos with Feedback! Energy Ethos Adopting the right command practices, planning, and end user behaviors • 80% of energy use will be metered by building • Users will have visibility of consumption trends • Facility Managers will have ability to identify waste 6

  7. USMC Energy Intensity FY 2013 4th Quarter • Reduce energy intensity (consumption per square foot) 30% by 2015 relative to 2003 baseline. • Reduce energy intensity 37.5% by 2020 relative to 2003 baseline Installation Intensity Reduction vs. 2003 Baseline Annual USMC Energy Intensity Reduction vs. 2003 Baseline BASELINE: 98.27 MBTU/KSF - 17.4% TARGET: 68.79 MBTU/KSF 7

  8. MCIEAST Family Housing AMCC overall occupancy – 95% Lincoln overall occupancy – 98% • Waterfall to Priority 3-7 is occurring at MCAS New River, MCAS Cherry Point, and MCAS Beaufort/MCRD Parris Island/NH Beaufort). • To date, 5 unaffiliated civilians are residing aboard Cherry Point housing.

  9. MCICOM-NAVFAC MOU • Signed 20 June 2013 • Intended to better align NAVFAC to support USMC • NAVFAC agreed to transfer MCAS Beaufort and MCLB Albany support from NAVFAC Southeast (Jacksonville, FL) to NAVFAC MIDLANT (Norfolk, VA) • MCSF Blount Island continues under NAVFAC Southeast • MCAF Quantico continues under NAVFAC Washington • Implements reorganization of OICC & ROICC offices by 30 Sep 14 • ROICC becomes FEAD and reports to PWO at MCAS Cherry Point, MCAS Beaufort and MCLB Albany • Engineering and Facilities Support Contract branches report to FEAD • OICC becomes ROICC and reports to PWO at Camp Lejeune • MCAS New River, MCAF Quantico, and MCSF Blount Island are served by ROICC/FEAD at adjacent installations