A3-14(AG01)024-IWD. WG A3.32 Non Intrusive methods for Condition assessment of T&D switchgear Convener : Nenad Uzelac (USA) Secretary: Christian Heinrich (GE) Year of Kick-off: Dec 2013. Activity Report 2014. Retiring Members: No retiring members New Members:
E N D
A3-14(AG01)024-IWD WG A3.32 Non Intrusive methods for Condition assessment of T&D switchgear Convener: Nenad Uzelac (USA) Secretary: Christian Heinrich (GE) Year of Kick-off: Dec 2013 Activity Report 2014 • Retiring Members: • No retiring members • New Members: • All new members. See the list. Number of Members: 27 Regular Members: 20 Corresponding Members: 6 CIRED Members: 1 WG A3.32 AR 2014
First meeting in Berlin(December 2013) • Second meeting scheduled in Chicago (April 2014) • Third meeting scheduled in Paris (August 2014) • Fourth meeting to be scheduled in Q4 in Europe Meetings: WG A3.32 AR 2014
Team: • Good attendance at the first meeting – 16 members • Expecting18 members for the 2nd meeting in Chicago. • Expecting active participation from WG members. TEAM: • Diversified team from CIGRE (equipment manufacturers, utilities, universities). Number of young members! • Looking for additional MV utility members from South America, Europe and Middle East • Only one member from CIRED. No CIRED liaison has been nominated. WG A3.32 AR 2012
Work progress: Phase 1: Team building and data gathering phase (2014) • Collected and in process of reviewing 50+ white papers on Condition assessment. Collected individual contributions from the team. • Creating database of existing diagnostic methods. To compile all methods • Created definition and categories for Non-Intrusive WG A3.32 AR 2014
Work progress: • Created CIGRE WG website http://a3.cigre.org/WG-Area/WG-A3.32-Non-intrusive-methods-for-condition-assessment • Created subfolders and tables for document control. Uploaded 50+ white papers and contributions • Created bibliography and indexed all the documents. WG A3.32 AR 2012
Work progress: • Created 5 page Utility survey (T&D Switchgear Condition Assessment survey). • Objective is to collect data from utilities around the world to better understand current condition assessment practices and future trends for condition assessment in Power Industry. • What would be the best way to conduct the survey? WG A3.32 AR 2014
Schedule: • 2014 • Contributions / research • Technical Brochure outline • Chapter leads • 2015 • Continue contributions / testing / research • Rough draft of technical Brochure • End of 2016 • Complete technical brochure, Electra Paper, Tutorial WG A3.32 AR 2014
Initial TB outline: • Executive Summary • Introduction • Type of condition assessment methods for T&D switchgear • Benefits of condition monitoring methods • Applications • Diagnostic / Design Switchgear • Reliability • Proposed methods • Future Trends • Conclusions / Recommendations WG A3.32 AR 2014
Best practice for conducting the utility survey • Liaison with CIRED. Reporting to CIRED. • Recruiting MV utility members (through CIRED?) • Reaching out to CIGRE B Technical Committee • WG Posters in Paris? Discussion points: WG A3.32 AR 2014
Membershipwith approval of the last SC meeting WG A3.32 AR 2014