1 / 23

2008

Innovations and investments into the Russian power. 2008. Complex electrotechnical solutions. for FSK UES RF, JSC RusHydro, JSC “MosEnergo”, JSC “LenEnergo”, regional energy companies, JSC “Gazprom”, industrial groups “Lukoil”, “Nornikel”, “Severstal”, “Sibur”, “Transneft”,

leola
Download Presentation

2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Innovations and investments into the Russian power 2008

  2. Complex electrotechnical solutions for FSK UES RF, JSC RusHydro, JSC “MosEnergo”, JSC “LenEnergo”, regional energy companies, JSC “Gazprom”, industrial groups “Lukoil”, “Nornikel”, “Severstal”, “Sibur”, “Transneft”, “Atomstroyexport”, “Tehnopromexport”, and other leading companies of Russia and neighboring countries. Innovations and investments into the Russian power

  3. Promotion of newest technologies in the sphere of power engineering Integrated electrotechnical solutions of “Sim-Ross” Group of Companies make it possible to realize all kinds of “turn key” projects of creation, reconstruction and modernization of cable systems, substations, power transmission lines, power supply systems of plants, settlements and various spheres of human activities. engineering design delivery construction and installation works general contractor supervision commissioning Innovations and investments into the Russian power

  4. Group of companies “Sim-Ross" are the best world brands Innovations and investments into the Russian power

  5. Innovative introductions Group of companies «Sim-Ross»: • self-supported cables “Torsade”; • cables with cross-linked polyethylene insulation 6-35 кV и 110- 500 кV; • specialised cable armature; • armour high-voltage underwater cable; • unique Aero-Z cables designed for installation in the regions with extreme climate conditions; • industrial heating systems; • fire-resistant cable in halogen free sheath, etc. Innovations and investments into the Russian power

  6. The Group of Companies “Sim-Ross” has united twenty companies which operate in all regions of Russia and neighboring countries.

  7. The branch solutions of “SimRoss” for power, industrial, construction, oil-and-gas, mining and transport companies are: free and fire-resistant cables PYROHALON; cables for 3-35kV with EPR insulation (ethylene-propylene rubber CREALON); sensor systems of fire-safety LISTEC; industrial heating systems Thermon; household heating systems Nexans; cables for mines; cables for 10-35kV with XLPE insulation; ABC cables “Torsade” 0,4 -35kV; accessories for ABC cables Simel; cable accessories Raychem, GPH; electrotechnical equipment Legrand; wire cable trays Cablofil; explosion-proof equipment CMP and others. Science and Production Company “SimRoss” – the best supplier of electrotechnical products in 2007 Ahead of time Innovations and investments into the Russian power

  8. 12 years of stable growth • There are hundreds of big and unique projects • implemented by the Company in different • regions of Russia such as: • underwater power bridges 35kV • across Anadyr Strain in Chukotka, • across the lake Baikal to the Olkhon Island, • across the river Pechora; • the “anti-ice” systems on the roofs • of the Kremlin, the Bolshoy Theatre, • the Russian Museum in St. Petersburg; • the fire-resistant cable for the program • “New Moscow Ring”; • the flame-retardant and fire-resistant • cables for Moscow underground; • the three-core 10 kV and heat-resistant • cables for Vyksa metallurgical works; • -the airial lines AERO-Z, resistant • to extreme climate conditions in Krasnodar • region, on Sakhalin island, • in Amurskaya oblast; • -the fire-resistant cable Pyrohalon and Cabrofil • trays on the cable-braced bridge with the hanging restaurant • in Krasnopresnensky avenue in Moscow and many others. Innovations and investments into the Russian power

  9. FULL RANGE OF SERVICES OF CREATION, RECONSTRUCTION AND MODERNIZATION OF HIGH-VOLTAGE CABLE SYSTEMS, SUBSTATIONS, POWER TRANSMISSION LINES AND OTHER POWER FACILITIES. General contractor (EPCM-contractor) ENGINEERING DESIGN • supply of cables, accessories, equipment • cables and accessories up to 500kV of the leading world manufacturers; • armored underwater cable with XLPE and EPR insulation construction and installation works supervision INSTALLATION Exclusive rights to supply in Russia products of the world leaders: Nexans, Tyco Electronics, Reka, CCC GmbH Berlin and others. Subsidiary company “RosEnergoStroy” Affiliate in Saint-Petersburg Innovations and investments into the Russian power

  10. Leading operator of high-voltage projects Projects by JSC “LenEnergo”- substations “Lakhta”, “Shushary”, “Oktyabrskaya”, “Centralnaya”, “Rzhevskaya”; Complex of flood protection constructions in Saint-Petersburg; in Moscow – substation “Ochakovo”, “Tereshkovo”, “Grach”, “Marphino”, “Yashino”, “Barvikha”; projects by JSC “KubanEnergo” and JSC “OmskEnergo” etc. Innovations and investments into the Russian power

  11. Leading supplier of Russia’s general contractors dealing with construction of power facilities in CIS countries as well as in India, Burma, Algeria, Vietnam, Iraq, – “AtomstroyExport”, “TehnopromExport”, “TyazhpromExport” and others. • SUPPLIES: • special cable for nuclear power stations; • power cable, XLPE insulated from 0,4 up to 35 up to 110 kV and more; • fire-resistant cable in fire resistant halogen free sheath; • heating cable systems for industries and anti- ice protection; • structured cable systems (SCS); • elements of F-class cable systems (600 MHz and more); • cable for control and measurement equipment in compliance • with national and international standards, and also special cables, • designed in accordance with customer’s requirements; • optical mains for telecom network construction. Innovations and investments into the Russian power

  12. Uglich Experimental Repair and Mechanical Plant (UERMZ) produces instruments for measurement of soil characteristics, having no analogies and worked out by the Research Institute HYDROPROJECT of the USSR MinEnergo; specialized equipment and non-standard metallic constructions for Rosatom, space agency “Energy”, JSC “Gasprom”, components for electronic scales. At present the plant is preparing to launch the production of unique cable joints for 110-500kV together with a German engineering company. Before 2004 UERMZ was part of HYDROPROJECT RAO UES of Russia, from 2005UERMZ is a property of Group of Companies “Sim-Ross”. Innovations and investments into the Russian power

  13. Power technopark “Sim-Ross” first in Russia FACTORY Nexans on manufacture of a high-voltage cable with XLPE FACTORY Tyco Electronics on manufacture of electrotechnical production Manufacture high-voltage cable jointson technology companies CCC GmbH Berlin The logistical centre Innovations and investments into the Russian power

  14. POWER TECHNOPARK "THIS-ROSS" – MANUFACTURE SCARCE THE HIGH-VOLTAGE CABLE, ARMATURE AND THE EQUIPMENT According to plans for development of UES of Russia, the annual requirement of the Russian power for high voltage cables (220 and 500 кВ) makes more than 1000 kilometres. In Russia cables with XLPE 110кВ are issued in the limited volumes, cables 220кВ and pressure above – are not made in gen In Russia. High-voltage cable joints in Russia also are not made. The requirement for Russia and in high-voltage cable joints, the special equipment for substations increases. Innovations and investments into the Russian power

  15. POWER TECHNOPARK “Sim-Ross" – MANUFACTURE OF THE HIGH-VOLTAGE CABLE Cable 6 – 500кV XLPE Designed capacity - - 65 million euro First stage start-up - 4th quarter 2008г Volume of investments at the first stage of 35 million euro Innovations and investments into the Russian power

  16. POWER TECHNOPARK “Sim-Ross" – MANUFACTURE OF ELECTROTECHNICAL PRODUCTION Volume of investments at the first stage of 20 million euro Innovations and investments into the Russian power

  17. POWER TECHNOPARK “Sim-Ross" – MANUFACTURE HIGH-VOLTAGE JOINTS ON TECHNOLOGY CCC GmbH Berlin and the POWER EQUIPMENT FOR SUBSTATIONS Innovations and investments into the Russian power

  18. POWER TECHNOPARK “Sim-Ross" – MANUFACTURE HIGH-VOLTAGE JOINTS ON TECHNOLOGY CCC GmbH Berlin • Three stages: • import of accessories and assemblage of finished articles; • the organisation of release of 1/3 accessories the forces; • manufacturing of all details on УЭРМЗ, realisation for export Volume of investments – 5 million euro Hi-tech manufacture At the first stage is planned 10 workplaces Shop designed capacity – to 1000 products Output in 2008 - 5 million euro Innovations and investments into the Russian power

  19. POWER TECHNOPARK “Sim-Ross" THE LOGISTICAL CENTER The total area – 5 hectares The Modern computerised warehouse, is planned by the area of 9 000 sq. m For territories of the logistical centre creation of the customs terminal. Service of the companies entering into technopark "This-ross" and the enterprises of Yaroslavl region Is planned creation of own transport company Volume of investments of 5 million euro Innovations and investments into the Russian power

  20. BUILDING OF CLUB CONGRESS HOTEL, COTTAGE SETTLEMENT OF THE CLASS "LUX", YACHT-CLUB Complex development of the ground area of 24 hectares on the bank of Volga. Congress hotel for holding conferences, business negotiations, meetings of heads of the companies which are a part of technopark “Sim-Ross", and also for actions with participation of Open Society FSK of EUROPEAN ECONOMIC COMMUNITY, Open Society RusGidro, representatives of administration and business circles of Uglich and Yaroslavl region Innovations and investments into the Russian power

  21. POWER TECHNOPARK “Sim-Ross" TOTAL AMOUNT of INVESTMENTS AT the FIRST STAGE OVER 70 million euro QUANTITY of NEW WORKPLACES – 500 In 2009г. ALL ENTERPRISES of TECHNOPARK SHOULD LEAVE ON 70 % of DESIGN CAPACITY In 2010г. – ON 100 % Innovations and investments into the Russian power

  22. ГК “SIM-ROSS" IT IS READY TO COOPERATION: • in working out of the program of preparation and retraining in educational institutions of area of workers, experts of an average link; • technical officers for the enterprises for manufacture of the power equipment; • in expansion of technopark at the expense of new manufactures; • in service by the logistical centre of the companies of Yaroslavl region in investment projects. Innovations and investments into the Russian power

  23. Thanks for attention! Questions? Nauchniy proezd12, Moscow, 117246, + 7(495) 128-4735, 334-1833 Str. Kaliningradskaya, 16, Korolev,141070, phone/fax:: + 7(495) 745-2414 e-mail:info@simross.ru

More Related