1 / 20

Detailed Design Review

Detailed Design Review. P13681. Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures of Gas Fluids Major: Chemical Engineering Ana Maria Maldonado Role: Team Manager Major: Industrial Engineering Marie Rohrbaugh

Download Presentation

Detailed Design Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detailed Design Review P13681

  2. Austin Frazer • Role: Lead Engineer - Analysis • Major: Mechanical Engineering • Eileen Kobal • Role: Lead Engineer – Mixtures of Gas Fluids • Major: Chemical Engineering • Ana Maria Maldonado • Role: Team Manager • Major: Industrial Engineering • Marie Rohrbaugh • Role: Project Manager • Major: Mechanical Engineering The Team

  3. Agenda for the review • Overview of the Project • What are we trying to accomplish? • Our system designs • Math/ computer modeling to show our concepts were valid • How the system will be integrated • Part designs • 3D modeling • Analysis results • Lab View layout • Bill of Materials • What are we building vs buying • Test plans • Risk Assessment • Schedule for the rest of the Project

  4. UUT Problem Statement Fixtures interface between AGT can and UUT Fixturing/leakage similar to other side UUT leakage Fixture leakage To mass spectrometer High pressure helium High pressure helium Leakage from Unit UnderTest Leakage from Fixture Leakage from room through lid and baseplate

  5. Project Overview

  6. Our system ideas • Simulink modeling • Graphs showing the amount of He over time • Prove our ideas generated in the last review

  7. System Layout

  8. Enclosure

  9. Pipeline model Wires exit rear Some type of relief structure will be in place here

  10. Mounting to the can

  11. Through the Manifold

  12. Port Blocks

  13. The Plug

  14. Mounting to the side of the can

  15. LabView Layout

  16. Wire Diagram Each valve has 2 leads for a circuit. They will be connected to a terminal block and then to a terminal block on the AGT system

  17. Bill of materials • What do we need to buy • Who is responsible for each purchase

  18. Test plans • How they related to the engineering specs • When/ how we plant to test

  19. Our schedule going forth….winter and MSDII

More Related