An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAB Sponsor Progress Report Stan Krolikoski Design Automation Standards Committee 02/05/2013

  2. DASC WG Activity– Active WGs • 1076 VHDL Language Reference Manual • 1076.1 VHDL Analog and Mixed-Signal Extensions • 1647 Functional Verification Language e • 1699 The Rosetta Systems Level Design Language Definition • 1735 Recommended Practice for Encryption and Management of Electronic Design Intellectual Property (IP) • 1800 SystemVerilog--Unified Hardware Design Specification and Verification Language • 1801 Design and Verification of Low Power Integrated Circuits

  3. Sponsor Activity Summary (2012) • Average Working Group size • Individual-based: (1076, 1076.1, 1647, 1699) 10-25 • Entity-based (1735, 1800, 1801) ~12 • PARs approved by DASC 2012: 1 (1647) • PARs approved for extension by NesCom:1 (1735) • Stds sent to ballot: 2 (1800 and 1801) • Stds approved for publication: 1 (1800– to be published 2/2013)

  4. Highlights 2H 2012 • Resolution ballot finished for P1800 (SystemVerilog)– approval achieved • 11 entity balloters • 90% return rate; 90% approval • First Resolution Ballot for P1801 (low power) • 21 entities in Ballot Group; 95% return/approval • Second Resolution in progress • On RevCom March agenda • Draft spec almost finished in 1735 WG • Revised PAR for 1637 being developed in WG

  5. Plans For 1H 2013 • Expect NesCom approval of P1801 (low power) • First Ballot for P1735 (encryption) • Expect approved revised PAR for P1647 (e language) • Potential new PAR from Japan • “LSI-Package-Board”– under discussion

  6. Design Automation SCConstituency, Reach & Benefits • Constituency: Producers of electronics devices and their vendors • Reach: Nearly impossible to find an electronic device that was not developed using at least on DASC Standard • Benefits • Industry: global electronics industry is enabled by DASC Standards • Users gain the benefits of modern electronics