An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAPA DE HONDURAS

  2. PRIMERA LECCION: ANALISIS DE HIPOTESIS DE IMPACTO

  3. ¿POR QUE DECLARAMOS LA ALERTA DESDE EL 23 DE OCTUBRE DE 1,998, VARIOS DIAS ANTES DE SUFRIR LOS PRIMEROS IMPACTOS DEL HURACAN Y TORMENTA MITCH?

  4. CONDICIONES INICIALES EXISTENTES LA TEMPORADA LLUVIOSA DE SEPTIEMBRE Y OCTUBRE HABIA SIDO MUY ABUNDANTE EN TODO EL TERRITORIO NACIONAL. LA ZONA DE CONVERGENCIA INTERTROPICAL ESTABA MUY ACTIVA EN EL OCEANO PACIFICO Y MUY CERCA DE LA REGION SUR DE HONDURAS. (HURACAN FIFI, 1974)

  5. CONDICIONES PROBABLES POSIBLE SURGIMIENTO DE UN FRENTE FRIO, (CASO HURACAN MARCO, 1996)

  6. ESTOS SON EVENTOS ERRATICOS Y LA HISTORIA DE LA TRAYECTORIA DEL LOS HURACANES NOS HABIA ENSEÑADO A SER PRECAVIDOS.

  7. LOS PRONOSTICOS DE LLUVIA QUE POSIBLEMENTE SE DESARROLLARIAN DURANTE SU PASO POR TERRITORIO MARINO Y TERRESTRE ERAN DE 325 A 650 MILIMETROS DE LLUVIA EN 6 HORAS

  8. DEL DESCONOCIMIENTO TECNICO DE LA NATURALEZA DE ESTE TIPO DE EVENTOS - ALTO NIVEL POLITICO - NIVEL OPERATIVO - MEDIOS DE COMUNICACIÓN - POBLACION EN GENERAL

  9. DAÑOS DIRECTOS • INFRAESTRUCTURA HOSPITALARIA • HOSPITALES GRANDES 23/28 • CENTROS DE SALUD 123/670

  10. LAS ACCIONES HUMANAS COMO SER EL RELLENO DE CUNETAS PROVOCO DAÑOS A CARRETERAS

  11. EN ALGUNOS CASOS EXPLOTACION DE BANCOS DE ARENA, DEBILITARON ESTRUCTURAS DE PUENTES

  12. DE LA RED DE COMUNICACIÓN VIAL (CARRETERAS, PUENTES Y ALCANTARILLADOS)

  13. CONSTRUCCIONES HIDRAULICAS INADECUADAS

  14. DE LOS SISTEMAS DE ALERTA DE INUNDACIONES

  15. DE LOS CAMBIOS EN ESTRUCTURAS COMUNALES EN AREAS RURALES DE GRANDES ESTRUCTURAS HIDRAULICAS, COMO SER PRESAS

  16. Concepción Los Laureles Capital Rio Choluteca Deslizamiento IHSS

  17. PRESAS CONCEPCION Y LOS LAURELES LOCALIZADA EN LA PARTE SUR DE LA CIUDAD CAPITAL Y CUYA FINALIDAD ES EL ABASTECIMIENTO DE AGUA POTABLE

  18. UN DESLIZAMIENTO

  19. DE LOS SERVICIOS HOSPITALARIOS EN LA CAPITAL DAÑOS AL INSTITUTO HONDUREÑO DE SEGURIDAD SOCIAL (TAMBIEN SUFRIO DAÑOS PARA EL HURACAN FIFI, 1974)

  20. LAGUNA PROVOCADA POR DESLIZAMIENTO

  21. DE EDIFICACIONES PUBLICAS DAÑADAS EN LA CAPITAL • PENICENTERIA CENTRAL • MINISTERIO DE EDUCACION • - SERVICIO DE AGUA POTABLE • SERVICIO DE ENERGIA ELECTRICA • HOSPITAL PRIVADO LA POLICLINICA • CRUZ ROJA HONDUREÑA

  22. REPRESA EL CAJON DE CONCRETO DE 227 METROS DE ALTURA, DE LAS MAS GRANDES EN ALTURA Y VOLUMEN DEL MUNDO.

  23. * CENTRO DE SALUD RIO ULUA * CENTRO DE SALUD REPRESA EL CAJON

  24. LECCIONES APRENDIDAS DE LA PARTE ESTRUCTURAL DE LOS CENTROS DE SALUD EN AREAS DE INUNDACION

  25. ESCENARIOS DE SIMULACION DE EVENTOS DE DESTRUCCION MASIVA • VALLE DE SULA (ZONA NORTE) • TEGUCIGALPA (CAPITAL)

  26. LECCIONES APRENDIDAS • DE LA ALERTA GLOBAL • ANALISIS DEL PRONOSTICO DE SITUACION POST MITCH • TEMPORADA DE HURACANES TERMINADA 30 DE NOVIEMBRE • PRONTO SE INICIABA LA TEMPORADA DE FRENTES FRIOS

  27. LECCIONES APRENDIDAS • SOCIALIZACION DE LAS ESTRUCTURAS HIDRAULICAS • LOS LIDERES TAMBIEN MUEREN EN LAS EMERGENCIAS • CAPACITACION COMUNAL PARA PROTEGER LAS ESTRUCTURAS DE COMUNICACION VIAL • DE LAS INSTRUCCIONES INDIVIDUALES DE PROTECCION INDIVIDUAL

  28. LECCIONES APRENDIDAS • SE REQUIERE REFORZAR LA RECOLECCION DE DATOS DE LLUVIA AL TIEMPO REAL EN LAS AREAS ALTAS DE LAS MONTANAS • LAS ESTRUCTRAS VIALES DE LAS CARRETERAS PRINCIPALES, DEBEN SER SOBREDISENADOS

  29. LECCIONES APRENDIDAS • ES POSIBLE QUE TENGAMOS UN EVENTO DE MAYOR INTENSIDAD EN LLUVIA QUE EL HURACAN Y TORMENTA MITCH • LOS PLANES DE EMERGENCIA DEBEN INTEGRAR EN SU PLANIFICACION DESASTRES DE DESTRUCCION MASIVA • DE LA REFORESTACION • DEL PROGRAMA SUMA