INTEGRATED DESIGN PROJECT BFC 43303

INTEGRATED DESIGN PROJECT BFC 43303. IDP NEEDS…. Architectural Drawing Site Key Plan (Infrastructure) –make sure layout plan consists of site spot level (contour line), exist. utilities, exist. facilities, existing data extent beyond site boundary)

lilah
Download Presentation

INTEGRATED DESIGN PROJECT BFC 43303

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTEGRATED DESIGN PROJECTBFC 43303

  2. IDP NEEDS….. • Architectural Drawing • Site Key Plan (Infrastructure) –make sure layout plan consists of site spot level (contour line), exist. utilities, exist. facilities, existing data extent beyond site boundary) • Building Key Plan (Structure)- Floor key plan, side-front-back elevation, building cross section • SI Report • Bore Log, SPT value..etc • MSMA (Manual SaliranMesraAlam)- Design for surface runoff. • ArahanTeknikJalan JKR – Road design • Building Work Specification – JKR • Euro Code – Structure design

  3. Documents to be submitted…. Compulsory • Infrastructure • Earthwork • Road and Drainage • Sewerage • Water reticulation • Structure Preliminary Report & Final Report Choose one

  4. Drawing to be prepared… • Infrastructure • Earthwork • Key Plan Dwg- Slope, Retaining wall, DP or OSD, PL… • Cut and fill Dwg- differentiate with colour • Typical drawing detail Dwg- cross section for ; slope, retaining wall, earthwork. • ESCP (Erosion Sediment Control Plan) • Key plan Dwg. – propose temporary earth drain, silt trap, wash through, temporary crossing (drainage-culvert), site office location, hoarding, material storage, temporary excess. • Typical detail Dwg- Silt trap, wash through, hoarding, temporary drain, slope protection • Road and drainage (R&D) • Key Plan Dwg.- combine for both road and drainage (include road alignment, location road signage, drain network, drain invert level (IL), shoulder, parking area, road furniture.. • Typical Detail Dwg.-Pavement /Road thickness cross section, road signage, road furniture, side drain, drainage, sump, culvert and etc.. • Sewerage • Key Plan/Layout Plan – sewerage network, mainhole location, invert level, • Detail Dwg.- mainhole, longitudinal cross section for pipe network include invert level, septic tank detail or STP.

  5. Water reticulation • Key Plan Dwg- consist of pipe network from tapping point to water tank, location of sluice valve, air valve, meter, hydrant (90m interval) • Detail Dwg- sluice valve, air valve, meter, hydrant, • Structure • Foundation lay out Dwg- pilecap/pad footing/raft-include column loading • Detail Dwg-reinforcement distribution for foundation • Each floor layout Dwg- Include beam/column/slab label. • Beam detail Dwg for each floor • Column detail for the whole storey of building • Slab detail layout Dwg for each floor • Slab cross sectional for each floor • Stair case detail • Shear wall/Lift core detail if any

  6. Preliminary report consists of: • Brief description of project-nos of storey, project total cost, project location, space usage…. • Conceptual planning (sketch)-location of RC wall, silt trap location, beam/column/slab location, R&D location and etc… • Standard and guideline to be used; MSMA, ArahanTeknikJalan, Eurocode and etc… • Parameters and data to be used; building loading case, soil bearing capacity, slope gradient, and etc • Final report consists of: • Detail description of project and team working • Analysis and design • Calculation – for structure manual calculation and software • Drawig-key plan and detail • Cost estimation-Bill of Quantities (BQ)-taking off… • Appendices