Agile-Scrum in QA – Case study at TraderTools

Agile-Scrum in QA – Case study at TraderTools. Amitay Itskovitch TraderTools LLC QA Manager Email: amitay@tradertools.com Phone: +972-9-7408880, ext. 107. Presentation Overview. TraderTools – Streaming Executable Rates today Scrum Agile Methodology

liluye
Download Presentation

Agile-Scrum in QA – Case study at TraderTools

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agile-Scrum in QA – Case study at TraderTools Amitay Itskovitch TraderTools LLC QA Manager Email: amitay@tradertools.com Phone: +972-9-7408880, ext. 107

  2. Presentation Overview • TraderTools – Streaming Executable Rates today • Scrum Agile Methodology • How TraderTools Integrated QA into Scrum Agile

  3. Who are we? • The Company's STPlatform™ enables the streaming of executable rates from multiple sources, enabling any bank, broker or financial institution to become an electronic liquidity provider. • TraderTools™ LLC (TraderTools) is one of the world's leading suppliers of electronic Foreign Exchange (eFX) white-label, software solutions.

  4. Current Methodology – V Model / Water Fall • Pros: • Clear process • Clear division for responsibility • sets of requirements are predefined • Cons: • Not flexible : • Change requests in last minute • Bugs in UAT • Full cycles when finding Bugs • Risks at the end of the process – new system • Less time for QA

  5. Presentation Overview • TraderTools – Streaming Executable Rates today • Scrum Agile Methodology • How we in TraderTools Integrated QA into Scrum Agile

  6. What is Agile? • Mini Projects • Iterations • Each iteration is an entire software project: including planning, requirements analysis, design, coding, testing, and documentation • Dynamic • Flexible

  7. Scrum-Agile Elements • Time box Limited time of 30 days for Specification Reviews, Coding and Testing Date Driven! • Sprints Each month there is new sprint , the contents are from the product backlogs (list of requirements)

  8. Scrum-Agile Elements (2) • Drops Each sprint will contain X number of drops (mini pieces of the module / function ) for testing • Backlog • Product Backlog – list of required features • Development Backlog - sprint scope, updated every day

  9. Team members Responding reliably to change instead of conforming to plan The team is making decisions instead of taking instructions More individual responsibility and Self management Collective responsibility Scrum-Agile Elements (3) 10

  10. Scrum-Agile Elements (4) • Daily Scrum Meetings • Daily 15 minutes status meeting • Same place and time everyday • No discussions • Keep chickens QUIET • Three questions: • Things I have done since yesterday’s meeting • Things I am going to get done today • Obstacles that I need someone to remove

  11. The full Process Cycle

  12. Presentation Overview • TraderTools – Streaming Executable Rates today • Scrum Agile Methodology • How TraderTools Integrated QA into Scrum Agile

  13. Facing the Agile Challenges in QA • Change tests methodology: Move from V- model to Scrum • no chronological order • Requirements are not finalized • No customer • Hard to plan test scenarios

  14. Sprints 1-2

  15. Lessons Learnt – Sprints 1-2 • If you can’t test it don’t deliver it!!! • QA wasn’t part of the sprint ! • Dev had to take their own time to adjust • Ad hock Dev time re-evaluations and extensions • Not enough time for QA • No time for Dev to fix bugs (only blockers)

  16. Sprints 3-4

  17. Lessons Learnt – Sprints 3-4 • Not enough time for QA • write the docs took too much time • do we need complete docs? • QA overload – still single person • No time for dev to fix bugs (only blockers) • MUST assign time for bug fixes • Timing of sprints and drops • QA Backlog

  18. Sprint 5

  19. Lessons Learnt – Sprint 5 • Sprint final delivery (2nd drop) to QA should equal delivery to customer • QA write only Test cases • Start work with drops • Bugs from drop 1 aren't to be fix till drop 2 • 2nd drop for QA should be finalized (requirements and code)

  20. More Conclusions • Do we need STP/STD? • No requirements • Takes too much time • Better define and clarify Dev 2 QA • Insist on Dev performing unit/integration tests • Be part of the team: P.R. QA • Lot of automation • Nightly builds

  21. Advantages • To product - stability • To Developers – understand the requirements • To QA – better knowledge of the product • Flexible /Dynamic • Clear state of code • Quality: finding issues at the beginning

  22. Disadvantages • No final view • Hard to implement • Human perspective • No Team Leaders • Challenge in managing the product

  23. Summary • It won’t reduce time of Dev/QA. • It will increase the product stability. • Discover major issues at early stages. • It will increase confidence in the product . • It will reduce customers dissatisfaction (no design issues).

  24. THANK YOU!Any questions?Agile-Scrum in QA – Case study at TraderTools Amitay Itskovitch TraderTools LLC QA Manager Email: amitay@tradertools.com Phone: +972-9-7408880, ext. 107