An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vienna Economic Forum Tirana – The European Priorities in the Energy Sector for the Development of the Region Drs. Erik Regter

  2. Who are we? largest listed company in Austria 116 power plants (8,300 MW, 25 TWh) Trading volume 60 TWh, active in 10 countries 86 % of generation is hydro power Verbund Highlights SHAREHOLDING STRUCTURE Republic of Austria 51 % Provincial power utilities >25 % Free float <24 % Vienna Economic Forum Tirana – European Priorities in the Energy Sector for the Development of the Region

  3. 30,0 % What do we want? Presentin large growth markets, committed to generation assets in SEE • Focus on clean energy • hydro and renewables • gas as transitional technology • Asset based trader/retailer • Partnership with local players preferred 38,2 % 49,9 % Trading subsidiaries Vienna Economic Forum Tirana – European Priorities in the Energy Sector for the Development of the Region

  4. What is the issue? SEE lack of generation capacity to meet increasing demand Forecast Power Demand CAGR (2006-2020) • SEE-Markets show significantly higher electricity demand growth than W-Europe • Albania among the countries with the highest growth potential • Production shortages are seen in the region consequently increasing price levels and reducing security of supply Electricity Balance Albania 2006 0.6 TWh 6.0 TWh 5.4 TWh 1.2 TWh 20 % Vienna Economic Forum Tirana – European Priorities in the Energy Sector for the Development of the Region

  5. Verbund committed to utilize untapped hydro-potential Ashta HPP 2/3 of hydro potential currently unused Project Ashta • Run-of-River Hydro Power Plant • 40 – 70 MW on Drin river 36 % 64 % Vienna Economic Forum Tirana – European Priorities in the Energy Sector for the Development of the Region

  6. Thank you for your attention! Vienna Economic Forum Tirana – European Priorities in the Energy Sector for the Development of the Region