160 likes | 305 Views
Presentation On Proposed Network Up gradation GMC- Guntur. Bill collection from assesses through bill collectors directly from their door steps No cohesion of information on dues. Misappropriation of collected money Poor data accuracy Lack of transparency.
E N D
Presentation On Proposed Network Up gradation GMC- Guntur
Bill collection from assesses through bill collectors directly from their door steps No cohesion of information on dues. Misappropriation of collected money Poor data accuracy Lack of transparency A History- Bill Collection System
Online bill collection started in 2001 and fully in operation since July 2003 Assesses directly interact with GMC data base Won the customer confidence High data accuracy Fast in service and dispute resolution, if any Drastic growth in revenue collection Integrated billing OLC System
OLC started from : 01-07-2003 No.of Banks connected : 16 No.of GMC counters : 03 No.of transactions per day (average) : 386 Revenue collected per day (average) :Rs 6.26 Lakhs OLC at a Glance
OLC Tech Setup-Present DB Server Web Server 16 port switch PC at bank MODEM 16 port RAS MODEM DSL EXCHANGE
Low data rate speeds. Frequent flips and flops Low network uptime No redundancy High maintenance (36 modems, 2 RAS boxes,18 copper lines) Highly vulnerable cabling- over lay. Limited distance support (upto 2.5Km.) Highly susceptible performance to weather conditions. There is no central network management Right of way issues Problems & Limitations of Present network
At peak of collection season per day, the revenue collection is as high as Rs. 44 Lakhs.Below is the collection statement from 25th to 30th July 2003
A failure of network during the peak hours will cost GMC dearly
State-of -Art IEEE 802.11b wireless Technology Highly Reliable,Scalable & Flexible Highly secured communication (128 bit WEP encryption) Proven technology(Guntur, Cuddapah, Eluru,Ananthapur collectorates deployed Cisco wireless network) High data rates (11 Mbps line rate) Hardly any maintenance and recurring expenses Support up to 40Km (subject to line of sight) No right of way issues Easy manageability (GMC own network) Salient features of proposed wireless network
AB JKC College Block Diagram Wireless Network,GMC-Guntur Indian Overseas Bank Circle Municipal Office NTR Stadium AB Srinagar colony Additional Commnr. AB Ravindra Nagar AB Pattabhi Puram Bharat Overseas Bank Commnr.Camp Office AB Bradipet AB Arandalpet Eluru Bank Arandalpet AB Kothapeta AB Kannavari Thota AB Hindu College Municipal Corp Office Health office AB Old Guntur Union Bank Mahesh Co-Operative Bank AB Patnam Bazar Dena Bank AB Mirch Yard
Antenna Tower Connectivity Diagram At Central location At Citizen Center Antenna RF cable 802.11b Bridge Tower Router/ Switch Ethernet cable Power Injector 220V AC UPS (Optional)
High data rates. Ample bandwidth for Voice and Video High availability of network(>99%) Secured communication Centrally manageable network Easy operation and maintenance Benefits from the proposed wireless network
Collectorate Guntur- Wireless network switch switch switch switch switch switch switch switch switch switch ATA ATA ATA ATA APSWAN PBX SC&BC Welfare Offices Wireless Link ZP, PR&RWS FXO E0 DM&HO Gatekeeper & Gateway E1 Switch Collectors Office DCCB SP Bungalow JD Agri/ Survey Collectors Bungalow DRDA CPO Office J C Bungalow General hospital 2 pair voice cable UTP Cable R&B Office District Training center RDO Office C S Office DEO Office DPO Forest R&B Elect Vigilance Registrar Office Medical college
As the citizen are well acquainted with online collection system,more reliable and dependable network is essential. Frequent flips and flops of network communication putting the citizen and bankers to lot of inconvenience Wireless network is a potential alternative to the current network in terms of speeds, reliability and cost. CONCLUSION