An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RSH Packaging Peer Review 18 – Summary of still planned work Lars Seimetz, CAU, Kiel, Germany RSH Packaging Peer Review

  2. CAU Team 1 Engineer (L.Seimetz) 1 Technician (S.Kolbe) 1 Graduate Student (O.Kortmann) 1 Student Assistant 7 Scientists (Prof.Dr.R.F.Wimmer-Schweingruber, Dr.S.Böttcher, Dr.C.Martin-Garcia, Dr.E.Böhm, Dr.R.Beaujean, R.Mueller-Mellin, Dr.S.Burmeister) Support from SwRI Team in Programmatics Scheduling Hardware Testing Assembly of Electronics Support from DLR Programmatics Ressources RSH Packaging Peer Review

  3. Vaccum Chambers „Dirty Chambers“ for processing Materials Cleanroom (Class 100.000) installed Chamber for measurements under Vacuum (5*10e-6 mbar) Heating Oven Temperature Chamber Cooling/Heating Gradient +/- 5K/min from -85°C (LN2) to +150°C System Setup starting after Peer Review ESD-Workstations Various Sources for Calibration Miscellaneous Technical Equipment Infrastructure/ Test Capabilities RSH Packaging Peer Review

  4. Finish Definition and Qualification of Metallization on Detector-Carriers (AgPt on AlN) Validate Requirements of BC432m More Material necessary for FM/FS Incorporate Working Prototype of Main Flexboard Functional Test of „Pathfinder“-Unit, using Cosmic Particles Imminent Work RSH Packaging Peer Review

  5. Intensive Testing of „critical“ Interfaces in RSH CSA on CSI BC-Stack on BC432m Mechanical Preload on CsI Start thermal testing (cycling) with new temperature chamber on BC432m „Aging“ of BC432m ? Reliability of Glue Joints (BC432m-Dow Corning-Silicon) Intensive Testing and Improving of Procedures Imminent Work RSH Packaging Peer Review