An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy Group Kilowatt Hour Meter Team Leader: Kevin Manieri Team Advisors: Dr. Fish + Tom Austin Students: Dave Allen, Jack Geiger, Aaron Gettamy, Jon Martin, Ryan Slater, and Zach Sorrell Date: 11/14/2011 Project Update

  2. The Project • Objective – Design and implement a reliable and manufacturabledevice to measure, display, and limit AC power usage by a home or another building. • Energy sharing • Energy awareness • Energy conservation • Clients: • SIM (Serving In Mission) • Matt Walsh • Commercial Market

  3. History • Jan. 2004 – Site team installed solar array • Mahadaga, Burkina Faso • Handicapped Center • Solar pump for Maternity Clinic • Aug. 2007 – Request by Matt Walsh • Sept. 2009 – Project started • June 2010 – Nonfunctional prototype sent to Burkina • January 2012 – Functional prototypes sent to Burkina

  4. Current Work sdfg • Building hardware for KWHR Meter Version 1.2v2 • Coding Software • Testing Functionality • Creating complete meter

  5. Schedule - Milestones • 11/14/11: Complete Enclosure/Wired boards • 11/21/11: Completed electronic hardware testing of meter • 11/28/11: Programming complete • 12/12/11: System testing and 5 completed meters • 1/2/12: Site team trip to Mahadaga, Burkina Faso

  6. Prayer Requests • For our members to continue to have energy, passion, and time for the project. • Finish building/testing prototype before January • January site team trip • SIM and Matt Walsh’s work in Mahadaga Burkina Faso.