1 / 21

Location of 1 hectare plots to validate and calibrate crown analysis.

Location of 1 hectare plots to validate and calibrate crown analysis. 12 of 20 potential plots were fully inventoried in Nov 2010 and May 2011. Note: Excluded 9 from field outside the plot. Eric #3 - Natural forest. No field data. Eric #4 - Natural forest. No field data.

manjit
Download Presentation

Location of 1 hectare plots to validate and calibrate crown analysis.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Location of 1 hectare plots to validate and calibrate crown analysis. 12 of 20 potential plots were fully inventoried in Nov 2010 and May 2011

  2. Note: Excluded 9 from field outside the plot

  3. Eric #3 - Natural forest. No field data.

  4. Eric #4 - Natural forest. No field data.

  5. Note: Excluded 7 from field outside the plot

  6. Eric #8 / Field 138 - Cloud and shadow – no algorithm data.

  7. Note: Excluded 2 from field outside the plot

  8. Eric #11 - Pinuspatula with poor reflectance. No field data.

  9. Note: Excluded 1 from field outside the plot

  10. Eric #13 - No field data.

  11. Note: Excluded 2 from field outside the plot

  12. Note: Excluded 12 from field outside the plot

  13. Eric #20 - Pinuspatula with poor reflectance. Tenth ha plot in center. (Plots 16-18 in Kakamega forest and not included in algorithm area of analysis.)

  14. Above Ground Biomass- algorithm over predicts field estimated biomass by 74% in 10 non-forest plots- algorithm under predicts field estimated biomass in the 1 natural forest plot

  15. Trees per Hectare - algorithm over predicts field measured TPH by 32%

  16. Maximum Crown Area - algorithm over predicts field measured crown area by 76%

More Related