Mike Mraz WECC-0068 Drafting Team Chairman

Mike Mraz WECC-0068 Drafting Team Chairman. Modification of BAL-004-WECC-1 April 26, 2012 Webex. Clarify, Conform, Coordinate. Addressed FERC Directives Clarify terms and time frames “large accumulations” “24 hours per calendar quarter” Modify risk factors to “medium” from “low”

manju
Download Presentation

Mike Mraz WECC-0068 Drafting Team Chairman

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mike MrazWECC-0068 Drafting TeamChairman Modification of BAL-004-WECC-1 April 26, 2012 Webex

  2. Clarify, Conform, Coordinate • Addressed FERC Directives • Clarify terms and time frames • “large accumulations” • “24 hours per calendar quarter” • Modify risk factors to “medium” from “low” • Submit violation severity levels for requirements and sub-requirements without such

  3. Clarify, Conform, Coordinate • Conform to NERC Standards formats • Clear, measureable requirements • Specific measurements for each requirement • Follow each requirement with its’ measurement • VSL’s for each requirement • Coordinate Reporting and Control • Support a single ACE for both control and NERC reporting • “large accumulations” • “24 hours per calendar quarter” • Modify risk factors to “medium” from “low” • Submit violation severity levels for requirements and sub-requirements without such

  4. ACE w/ ATEC vs PII Mgmt • Previous Version of Standards • Different definition of ACE in BAL-004 • Apparent conflict with BAL-001 • NERC interpretation conflicted with BAL-004 R3 • BAL-004 had issues with clarity, process • New Version of Standards • ACE redefined in Regional Var. to BAL-001 • BAL-004 focused on PII management

  5. WECC Variance – BAL-001 • Redefines ACE to include ATEC • New ACE applies to all standards • CPS1/2 are calculated referring to new ACE • Reformulation breaks out ATEC term • Definition of ATEC term unchanged • Identifies limit Lmax applied to ATEC term • Identifies range of value for Lmax

  6. BAL-004 Revised • A monthly limit of 150% load or gen • ATEC out-of-service – 24 accumulated hrs • ATEC is methodology for PII payback • Remaining requirements rearranged to facilitate specifying direct measurements • 50 min window for ATEC term, PIIhourly/accum • 90 day recalc window on error detection • AGC control mode management • Month end adjustments – 100% PII

  7. Questions?