1 / 12

Alternate Bidding & Asphalt Price Adjustment

Alternate Bidding & Asphalt Price Adjustment. Pat Gardiner Bureau Of Maintenance And Operations. Why. Concept. Market Conditions Control Concrete Vs Asphalt Fostered By The Concrete Industry LCCA Process No Longer Determines Pavement Type WIN - WIN For PennDOT And Industry

Download Presentation

Alternate Bidding & Asphalt Price Adjustment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alternate Bidding & Asphalt Price Adjustment Pat GardinerBureau Of Maintenance And Operations

  2. Why

  3. Concept • Market Conditions Control Concrete Vs Asphalt • Fostered By The Concrete Industry • LCCA Process No Longer Determines Pavement Type • WIN - WIN For PennDOT And Industry • Lower Prices Thru Competition

  4. Criteria • Sol 465-09-3 • Applies To Structural Improvements • Interstates Over $3 Million • Other Facilities Over $15 Million

  5. The “C” Factor • Includes • Future Maintenance Costs • User Delay Costs • Residual Life Discount • AC Lifecycle = 50 Yrs • Concrete Lifecycle = 55 Yrs

  6. Design Options • PennDOT Embraced Alternate Bidding To Save Money • Plans Can Show: • 1 Alternate Pavement Design • 0 Alternate Pavement Designs • Both Alternate Pavement Design • Not Recommending Designing Both Alternates Based On Cost

  7. The List • 3R & 4R Projects • Columbia Co SR 80 Sec 078 • Allegheny Co SR 28 Sec A09 • Allegheny Co SR 28 Sec A10 • Washington Co SR 70 Sec Y20 • Bucks Co SR 95 Sec TPK • Somerset Co SR 6219 Sec 020 • Monroe Co SR 209 Sec 007

  8. Future • Focus Is On Preservation • Limited Dollars • Bridge Priority • Open Plan Schedules To Include Pavement Design

  9. Asphalt Price Adjustment • Who Cares • Adjustments Made Based On Monthly Index When Material Is Placed vs The Index In The Proposal

  10. LCCA • AC Adjustment Factor • Previously Calculated Based On Amount Paid For Projects Closed Out In Last 6 Months • This Yields Untimely Factors

  11. LCCA • New Process • AC Adjustments EARNED In Last 12 Months • New Factor Calculated On 6 Month Basis • Data Is Used In Calculation Of “C” Factor

  12. Questions

More Related