50 likes | 171 Views
Status for G4 simulation of scintillator KLM. Galina Pakhlova, ITEP. Many thanks to Leo and Hara san. Geometry structure. klm_end_cap 4 klm_end_cap_sector 14 klm_end_cap_gap klm_end_cap_scint (module) klm_end_cap_air klm_end_cap_strip 75 vertical 75 horizontal.
E N D
Status for G4 simulation of scintillator KLM Galina Pakhlova, ITEP Many thanks to Leo and Hara san
Geometry structure • klm_end_cap • 4 klm_end_cap_sector • 14 klm_end_cap_gap • klm_end_cap_scint (module) • klm_end_cap_air • klm_end_cap_strip • 75 vertical • 75 horizontal
Strips geometry • klm_end_cap strips • implemented to g4superb_klm package (in my ~/home) • preliminary strip geometry version • to be be changed to realistic final design as soon as strip geometry will be fixed
End_cap_scint modules end_cap_scint(modules) are installed into air end_cap_gaps (old design) vertical and horisontal end_cap_strips are installed into moduls (for a moment no Al foil between them)
Next steps • simulation • hits • detector response: amplitude&time resolution/DAQ • neutron bckg simulation • raw data tables • reconstruction • mu ID • KL • ... • realistic design