An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary NFMCC Collaboration Meeting Fermi National Accelerator Laboratory March 20, 2008

  2. MUTAC07 Recommendations • Give highest priority to acquisition of a coupling coil for MUCOOL. • Continue participation in MICE and MERIT as much as possible. • Continue to grow ties with IDS for a neutrino factory. • Take advantage of newly established efforts on a design of a Muon Collider (MCTF). • Leverage resources within the MCTF and UKNF collaborations, and Muons, Inc. to increase the manpower directed towards simulations of the acceleration system and storage ring.

  3. MUTAC07 NFMCC/MCTF • Recommendation • Coordination of MCTF with NFMCC is essential to ensure that the muon collider effort makes best use of limited resources, avoids duplication, and shares infrastructure, codes, and results. Although coordination is important, we recommend that the NFMCC remain independent, so that initiatives are not restricted by local (FNAL) preferences and constraints.

  4. The Long-Term Vision

  5. Palmer’s P5 Presentation

  6. Collaboration Priorities • Successfully conclude: • MERIT • MICE • Prepare for a Muon Collider Feasibility Study • Post-MICE priorities • Design and Simulations • Component Development • Long-term goal (Post MC Feasibility Study) • 6D Systems test

  7. Collaboration Near-Term Priorities • Design and Simulations • Targetry (address MERIT results) • Develop and advance 6D cooling schemes • Develop robust Collider ring solution • Consistent acceleration scenario from 250MeV to • 750GeV and then to 2TeV • NF and MC Detectors • Component Development • NCRF • SCRF • HTS

  8. Homework Assignments • Design and Simulations: • Simulations committee should submit a plan detailing the level of effort required to allow a successful start-up of a 2011 MC Feasibility Study • Technical Board August 15 • Component Development: • Proposals for component R&D should be submitted detailing level of effort and associated costs.

  9. Backup Slides

  10. NFZDR Geer’s P5 Presentation 2007 2012 2017 2022 2027 NOVA RUNNING NOVA CONSTR UPGR. NOVA RUN PROJ X CNSTR PROJ X R&D NF R&D NF CONSTR NF R&D Hg-Jet TargetDemo. 10% trans. emmit. cooling MERIT open-Iris, closed-cell, high-press. RF? MICE EXPT NCRF R&D Cyro-modules for acceleration 201 MHz SCRF Detector R&D Magnet prototype test & cost reduction R&D IDS Study + FNAL-Specific PRECONSTR. R&D