10 likes | 26 Views
Residential and commercial developments need Building plan approval requirements wherein the building size exceeds 2,400 Sq Ft. Area reserved for services such as electrical substation or panel room, generator, pump room, AC plant room, solid waste management, fire control room, security, or CCTV room.<br>
E N D
Building Plan Approval Requirements Withthisamendment, onlyBBMPbuilding planapprovalisrequiredforboth residentialandcommercialdevelopments, incasethelandareaislesserthan20,000 SqM. Changeinthelandareafora Non-residentialdevelopment Plan BBMPbuildingplanapprovalismandatoryfor alldevelopmentswhereinbuildingsizeexceeds 2,400SqFt. InadditiontotheBBMPbuilding planapproval, aDevelopmentPlan (DP) ApprovalisrequiredfromtheBDAorBMRDA. VidedocumentUDD255MNJ2018dated 19.06.2019, foravailingaDPapprovalfor constructionofoneormorecommercial buildings, thelandarearequirementhasbeen increasedfromtheearlierlimitof12,000SqM to20,000SqM. Exclusionsincomputationof SaleableArea Areareservedforservicesuchaselectrical substationorpanelroom, generator, pump room, ACplantroom, solidwastemanagement, firecontrolroom, security, orCCTVroom Refugeareasasprovidedinhigh-risebuildings asperfirenorms Aseparatepublictoiletblockprovidedinthe non-residentialcomplexorplot Buildingmanagementorsocietyroomswitha maximumsizeof40SqM Staircase / Staircaseroom Architecturalfeatureswhicharenotusablefor livingorotherpurposes Chimneys, ventilationductsandgarbageshafts, ducts Parkingareasincludingdrivewaysandramps Swimmingpoolsandtoiletsattachedto swimmingpoolsconstructedinopenyardor anyfloorforcommonusebytheresidents References https://meraqiadvisors.com/blogs/bbmp-building-plan- approval-process facebook Twitter LinkedIn