1.04k likes | 4.89k Views
DAMS in PAKISTAN. USMAN ABDUL HAMEED May 25, 2010. DAMS IN PAKISTAN. PRESENTED BY : USMAN ABDUL HAMEED 08-RCET-EE-23 RACHNA COLLEGE OF ENGINEERING AND TECHNOLOGY GUJRANWALA. POWER GENRATION. TOTAL REQUIRED: 15630 MW TOTAL PRODUCED: 12150 MW TOTAL SHORT FALL:
E N D
DAMS in PAKISTAN USMAN ABDUL HAMEED May 25, 2010
DAMS IN PAKISTAN PRESENTED BY : USMAN ABDUL HAMEED 08-RCET-EE-23 RACHNA COLLEGE OF ENGINEERING AND TECHNOLOGY GUJRANWALA
POWER GENRATION • TOTAL REQUIRED: 15630 MW • TOTAL PRODUCED: 12150 MW • TOTAL SHORT FALL: 3480 MW
PRESENT DAMS MANGLA DAM MIRANI DAM TARBELA DAM WINDAR DAM RAWAL DAM SHAKIDOR DAM KHANPUR DAM GHAZI BROTHA DAM SIMLY DAM HUB DAM
MANGLA DAM • PROJECT: 1961-1967 • IMPOUND: JEHLUM RIVER • LOCALE: MIR PUR AZAD KASHMIR • POWER GENRATION CAPACITY: 1000 MW
TARBELA DAM • PROJECT: 1968-1971 • IMPOUND: INDUS RIVER • LOCALE: DIST. HARIPUR • POWER GENRATION CAPACITY: 4200 MW
RAWAL DAM IMPOUND: RAWAL LAKE • LOCALE: • RAWALPINDI • POWER GENRATION CAPACITY: 600 MW
IMPOUND: INDUS RIVER LOCALE: NEAR KHANPUR TOWN POWER GENRATION CAPACITY: 0 MW COST OF CONSTRACTION: Rs 1352 billions THIS DAM IS USED TO SUPPLY WATER TO ISLAMABAD AND RAWALPINDI(25 Km AWAY FROM ISLAMABAD) BY USING THIS DAM WE CAN GET 50-60 MW DAILLY KHANPUR DAM
IMPOUND: INDUS RIVER LOCALE: NEAR GHAZI AND BROTHA TOWN COST OF CONSTRUCTION: US $2.3 Billions POWER GENRATION CAPACITY: 1450 MW OPENING DATE: 2002 GHAZI BAROTHA DAM
SHAKIDOR DAM • LOCALE: NEAR PASNI • COST OF CONSTRUCTION: Rs 45 MILLIONS • OPENING DATE: 2003 ON FEB, 10,2005 DAM BRUST AND WIPED OFF ALMOST 70 VILLAGES
SIMLY DAM • IMPOUND: SOAN RIVER • LOCALE: 25 Km AWAY FROM ISLAMABAD • USED: A LARGEST DRINKING WATER RESERVIOR FOR PEOPLE OF ISLAMABAD BY USING THIS WATER WE CAN GENRATE ALMOST 50-60MW
FUTURE DAMS AKHORI DAM BASHA DAM GOMAL ZAM DAM KALA BAGH DAM
PROJECT: 2025 IMPOUNDS: HARO RIVER LOCALE: NEAR AKHORI VILLAGE 28 KM NEAR ATTOCK POWER GENRATION CAPACITY: 600 MW CONSTRUCTION COST: $ 1.6 BILLION EST. AKHORI DAM
PROJECT: WORKSTART FROM AUG 2002 IMPOUNDS: GOMAL RIVER LOCALE: NORTH WEST KHABER PAKHTON KHAN POWER GERATION CAPASITY: 17.4 MW COST OF CONSTRUCTION: Rs.12 BILLIONS GOMAL ZAM DAM
PROJECT: ( 2009-2016) IMPOUNDS: RIVER INDUS. LOCALE: NORTHEN AREAS POWER GENRATION CAPASITY: 4500 MW COST OF CONSTUCTION: $12.6 BILLIONS BHASHA DAM
IMPOUNDS: INDUS RIVER LOCALE: KALA BAGH AT MIAN WALI POWER GENRATION CAPACITY: 1000 MW THIS PROJECT IS CANCELLED DUE TO THE OPPOSITION FROM SINDH KALA BAGH DAM