An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EU Developments

  2. August Update • European Network Code Workshop held 15th July • Slides have been published on JO website • Draft Vision European Gas Target Model • Council of European Energy Regulators (CEER) Public Consultation launched 5th July • Consultation deadline: 20th September 2011 • Ofgem Workshop planned 1st September 2011 • ACER Framework Guidelines on interoperability rules • Scoping consultation to be published 4th August 2011 • Consultation deadline: 15th September 2011

  3. Moffat Physical Reverse Flow (PRF): Market Assessment • EU Regulation 994/2010 to ‘Safeguard Security of Gas Supply’ includes an infrastructure obligation, that states that all European cross border points should have bi-directional flow capability, or for an exemption to be granted • As part of the process to either gain an exemption or agree a viable proposal for PRF at Moffat, National Grid, along with Gaslink and Mutual Energy are undertaking a Market Assessment to assess the market demand for PRF at Moffat • The Market Assessment includes a supply and demand outlook, a high level technical feasibility study, along with a questionnaire that allows market participants to express their interest in a non-binding manner • The Market Assessment is expected to be published imminently, and will be available for a 2 month window on both the National Grid and Gaslink websites