170 likes | 378 Views
Logistics Services. Packaging Services Update. April 2012, Reghed. Presented By: Marc Flynn, LLWR Logistics Services Manager (RAMTUC Chairman). Packaging Services. LLWR Packaging Services Team LLWR Packaging Services Scope LLWR Packaging Services - Request for services process
E N D
Logistics Services Packaging Services Update April 2012, Reghed Presented By: Marc Flynn, LLWR Logistics Services Manager (RAMTUC Chairman)
Packaging Services LLWR Packaging Services Team LLWR Packaging Services Scope LLWR Packaging Services - Request for services process Packagings available and associated equipment (sale) Packagings available and associated equipment (hire) 2012/13 new Packagings and equipment Package Support Services Package Operational Guidance Documentation New Container Release Protocol
Integrated Logistics Services TeamTel – 019467 70301transportandlogistics@llwrsite.com
Packaging Services - Scope • Package/Ancillary/Stillage Design & Manufacture • Container Licensing Management (SA & CA) • Licensed Container Supply - Re-usable (rental) - Disposal (supply) - Used Disposable (supply and buy back) - Container Operational Support, CSC Inspections, Leak tests • Low Cost Disposable Receptacle/Package Supply • Container spares (Supply) • Container Repair (assessment to full repair) • Waste loading Assessment Service (WLPs) err
Services ProcessLogistics Services process integrates Packaging Services and Transport Services LEN Form LEN Form LSQ Form
LLWR Packaging Offered Today TC05 0017A via SL TC10 TC01 & TC03 TC24 TC02
TC01 developments TC01 – Re-Licensed with 3 x operational systems • Single use disposable option • 3 x Multi-use option (2/3 pay load) with no restrictions other (than informing LLWR on usage and usual WLP requirements) • New ACEP option (2/3 pay load) for multi-use with restrictions on loading arrangements
LLWR IP-2 ISO Container Supply (TCxx) • Successfully re-tested TC01, TC08 & TC03 designs at 2 x new manufacturers over the past 12 months • New Container Manufacture and Design Support Framework Contract in place - 3 x container manufacturers • W H Davis Containers • Bootle Containers • Yorkshire Marine Container Solutions • Sustainability of Container Supply – healthy! Transport & Logistics
Container Release Process Container Release Process post acceptance of quote when arranging own transport • Send request to collect containers in writing (email) to LLWR • LLWR will prepare a Container/Ancillary Equipment Release Form Note – LLWR has 3 x Container manufactures located in different areas • LLWR will prepare a Container/Ancillary Equipment Release Form • Copy of the Release Form is sent to the applicable Manufacturer and Customer • Customer must provide copy of the Release Form to their Driver • Upon arrival at Manufacturer, Release Form is checked to aligns with the Release Form emailed to the Manufacturer from LLWR • Containers will be loaded onto the conveyance for transport Warning – Without possession of a Release Form Containers will not be released from the manufacturer
Packaging in progress – 2012/13 TC02 Waste Boxes; full size & half size & quarter size TC14 IP-2 Drums (liquid and solid)
Packaging in progress – 2012/13 TC02 Optimum Capacity half size Stillage 15te TC02 Optimum Capacity full size Stillage (and Drum variant) 29te
Packaging developments for VLLW VLLW Packaging
Packaging in progress – 2012/13 TC11 SSP Delivery System
Packaging in progress – 2012/13 License Status TC16 NEW - Oversize IP-2 Powered Recovery Container with variable internal restraint system
Packaging Support - Guidance Notes 1- 9 PAA/GN01 - IP-2 ISO CONTAINER CSC INSPECTION AND SEAL LEAKAGE TEST – uprevd PAA/GN02 - IP-2 ISO CONTAINER DIRECT POUR ENCAPSULATION – uprevd PAA/GN03 - STUD REPAIR GUIDANCE PAA/GN04 – SECURING ITEMS IN TC01, TC03 GUIDANCE - Schedules 1 – 11 - 11 X STANDARD LOADING PLANS – uprevd PAA/GN05 – MINIMUM MONITORING REQUIRMENTS FOR IP-2 ISO CONTAINERS uprevd - Schedule 1 - TC02 MIMUMUM MONITORING PAA/GN06 – OPERATIONAL QUALITY PLAN FOR VLLW CONSIGNMENT PAA/GN07 - DRUM SECURING IN FULL HEIGHT IP-1 ISO CONTAINERS – IN PREP PAA/GN08 – OPERATIONAL QUALITY PLAN FOR TC02 PAA/GN09 – OPERATIONAL QUALITY PLAN FOR TC01 & TC03