1 / 15

Whistler Lodge Survey

Whistler Lodge Survey. December 2012 Commissioned by the VP Administration. Introduction. Dec. 2011 Coriolis Report Jan. 2012 Referendum Continuous consultations with Ski and Board and VOC Preliminary Club Survey Open Forum Campus-Wide Survey. Details. Split into: Lodge users 465

omar
Download Presentation

Whistler Lodge Survey

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Whistler Lodge Survey December 2012 Commissioned by the VP Administration

  2. Introduction Dec. 2011 Coriolis Report Jan. 2012 Referendum Continuous consultations with Ski and Board and VOC Preliminary Club Survey Open Forum Campus-Wide Survey

  3. Details Split into: • Lodge users 465 • Non users 2663 • 3000+ responses • On-campus bias (28% v. 17%) Lodge Perceptions: 48% service 14% business >

  4. Lodge use by faculty

  5. “I would prefer the AMS to maintain a lodge in Whistler.”

  6. “…If there were no changes to student fees, I would prefer…” Refurbish Maintain

  7. Conclusions Lodge is viewed primarily as a service Plurality of users AND non-users prefer to keep a lodge Preference is to Refurbish or Maintain

  8. Proposal For Consideration

  9. Proposal Continue Whistler Lodge as a service Long term plan to refurbish the lodge and fund capital repairs through Student Spaces Fund Early preliminary estimate of total cost: ~ $700,000

  10. Required 2013 Costs • $85,000 in 2013 • Deck entrance $10,000 • Exterior exit door replacement $7,000 • Upper deck of hall $50,000 • Manager suite renovations $15,000

  11. Required 2014 Costs • $111,000 Washroom repairs and ventilation $50,000 • Chimney repairs $11,000 • Roof $50,000 • $224,000 • Building envelope and windows $200,000 • Furniture replacement and upgrades $20,000 • Other $4,000

  12. Considerations Student Spaces in Code History of Student Spaces funding New SUB Microbrewery cost Potential emergency funding

  13. Student Spaces Fund The Student Spaces Fund (formerly CPAC) shall be administered by Council on the recommendation of SAC, the Student Life and Communications Committee, or the Executive Committee. The Fund shall be used to finance specific capital projects authorized by the referenda of November 1982 and November 1991, including: i) the construction of new day care facilities; ii) development of athletic facilities in the vicinity of the SUB; iii) development of on-campus student housing; iv) SUB renovations and expansion; and v) Whistler Cabin renovations and expansion.

  14. Path Forward Move forwards to refurbish the lodge as service to students with continual capital funding from Student Spaces Maintain lodge as is with funding from Student Spaces Sell the lodge with profits going to AMS Endowment fund

More Related